My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
12550
>
2800 - Aboveground Petroleum Storage Program
>
PR0537957
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 9:48:16 AM
Creation date
10/15/2018 3:11:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537957
PE
2832
FACILITY_ID
FA0021911
FACILITY_NAME
HEARTLAND EXPRESS INC
STREET_NUMBER
12550
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
12550 S Harlan Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cesar Ruvalcaba [EH] <br /> From: Bill Habenicht <BillHab@outlook.com> <br /> Sent: Friday, November 9, 2018 3:08 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Cc: Jim Smith; Nicholas Stamm;Thomas @frogenv.com;Alyssa Mares <br /> Subject: Hearland Express: Request for 30-Day Extension <br /> Mr. Ruvalcaba, <br /> I'm contacting you on behalf of Heartland Express, located at 12550 5 Harlan Road, in Lathrop, to request an extension <br /> of time to complete the following items noted in the Aboveground Petroleum Storage Act Inspection Report, dated <br /> October 15, 2018: <br /> ? Update SPCC Plan to address change of ownership, annual discharge briefings, integrity assessments, overfill <br /> prevention procedures, and other necessary revisions (inspection items#301,#622,#710, #715,#726) <br /> ? Implement monthly inspections and annual integrity tests of aboveground tanks and bulk containers (inspection <br /> items#618,#710) <br /> ? Train personnel (inspection item #619) <br /> ? Conduct discharge prevention briefing (inspection item #622) <br /> ? Update Hazardous Material Business Plan in CERS <br /> The due date for correcting the violations and submitting the Return to Compliance Certification form is November 14, <br /> 2018; we are requesting a 30-day extension, until December 14, 2018. <br /> In order to meet the requested due date of December 14, we have scheduled training at the facility on Thursday, <br /> November 29th. During that site visit, we will also gather the information needed to prepare the SPCC Plan and HMBP <br /> update.That should allow sufficient time to complete those two plans by the requested due date. <br /> Please let us know if this proposed extension is acceptable, and if you have any questions.Thank you, and we appreciate <br /> your consideration of our request. <br /> Bill Habenicht <br /> REA #7211 / QISP ToR #145 / CPSWQ #886 / REPA #382645 <br /> FRU . G <br /> ENVIRONMENTAL <br /> Frog Environmental, Inc. <br /> 800 E Ocean Blvd #105 <br /> Long Beach, CA 90802 <br /> Email: billhab@outlook.com <br /> Tel: (310) 241-0866 <br /> Cell: (206) 321-4767 <br /> Fax: (310) 241-1442 <br /> Web: www.FrogEnv.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.