Laserfiche WebLink
SAN.JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.smgov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT(APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Facility Gordon Trucking Inc Facility Insp12550 South Harlan Rd, Lathrop Date: <br /> Name: Aug 27, 2013 <br /> g Address: <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=CA Health and Safety Code;CFR=Code of Federal Regulations <br /> C1=Class 1 violation;C2=Class 2 violation,M=Minor violation <br /> General Requirements for SPCC Plans(continued) <br /> 509 CFR 112.7(a)(3)(v) SPCC Plan failed to address disposal methods for recovered materials <br /> 510 X CFR 112.7(a)(3)(vi) SPCC Plan failed to include required contact list and phone numbers of the facility's response <br /> coordinator, cleanup contractors,and agencies to notify in case of discharge <br /> 511 CFR 112.7(a)(4) Failed to provide information and procedures to enable a person to adequately report discharges if a <br /> response plan was not submitted to the Regional Administrator(RA) <br /> 512 CFR 112.7(a)(5) Failed to organize emergency procedures for discharges in a readily useable way if a response plan <br /> was not submitted to the RA <br /> 513 CFR 112.7(b) SPCC Plan failed to include a description of potential equipment failure(direction,flow rate,quantity), <br /> orprovide a uivalence as allowed by CFR 112.7(a)(2) <br /> 514 CFR 112.7(c) Failed to provide secondary containment and/or diversionary structures that are capable of containing <br /> discharge from primary containment until it is cleaned u <br /> Failed to provide explanation,conduct periodic integrity testing of containers and/or periodic integrity <br /> 515 CFR 112.7(d) and leak testing for valves and piping if containment or discharge prevention structures were <br /> determined to be impracticable on an SPCC Plan or sections of one that is PE certified <br /> If a response plan was not submitted to the RA, and containment or discharge prevention structures <br /> 516 CFR 112.7(d) were determined to be impracticable,the SPCC Plan failed to provide:(1)an oil spill contingency plan; <br /> 2 written commitment of manpower,equipment, materials to control and remove oil discharge <br /> 517 CFR 112.7(e) Failed to conduct inspections and tests in accordance with written procedures and/or maintain signed <br /> records of inspections and tests as required by the facility's SPCC Plan on site for 3 years <br /> 518 CFR 112.7(f) Failed to: (1)train personnel on discharge prevention; (2)designate a person to be accountable for <br /> dischargeprevention;or 3 schedule prevention discharge prevention briefings at least annual) <br /> Failed to describe how the oil handling,processing and storage areas are secured and controlled; how <br /> 519 CFR 112.7(g) master flow and drain valves are secured; how unauthorized access to starter controls on oil pumps are <br /> prevented; how out-of-service and loading/unloading connections are secured;the appropriateness of <br /> security li htin ;or provide equivalence as allowed by CFR 11 2.7a 2 <br /> Failed to provide sufficient secondary containment capacity for tank car or tank truck loading and <br /> 520 CFR 112.7(h)(1) unloading rack if drainage area is not designed to flow into a catchment basin designed to handle <br /> discharges <br /> 521 CFR 112.7(h)(2) Failed to provide methods to prevent vehicles from departing loading and unloading racks before <br /> complete disconnection of transfer lines or provide equivalence as allowed by CFR 112.7(a)(2) <br /> Failed to inspect lower-most drains and all outlets of vehicles for discharge prior to filling and departure <br /> 522 CFR 112.7(h)(3) and take appropriate measures to prevent liquid discharge while in transit or provide equivalence as <br /> allowed by CFR 112.7(a)(2) <br /> Failed to evaluate field-constructed container for risk of discharge or failure due to brittle facture or <br /> 523 CFR 112.7(i) other catastrophe after repair,alteration, reconstruction, or change in service,or provide equivalence <br /> as allowed by CFR 11 2.7a 2 <br /> SPCC Plan failed to include a complete discussion of conformance to discharge prevention and <br /> 524 CFR 112.70) containment procedures as listed in part 112 and any applicable more stringent State rules, regulations, <br /> and guidelines <br /> If a response plan was not submitted to the RA, and secondary containment is not provided for qualified <br /> 525 CFR 112.7(k)(2) oil-filled equipment,the SPCC Plan failed to: (i)establish and document procedures for inspection or a <br /> monitoring program to detect equipment failure and/or discharge;(ii)provide oil spill contingency plan <br /> and/or written commitment of manpower,equipment,materials to control and remove oil discharge <br /> SPCC Plan Requirem®ntsfor Onshore Facilities(excluding production facilities) <br /> 601 CFR 112.8(b)(1) Failed to prevent discharge into the drainage system from diked storage areas and/or inspect <br /> accumulation prior to drainage,or provide equivalence as allowed by CFR 11 2.7a 2 <br /> 602 CFR 112.8(b)(2) Failed to use manual,open-and-closed design valves for the drainage of diked areas, or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> Failed to design facility drainage system from undiked areas to flow into appropriate ponds, lagoons,or <br /> 603 CFR 112.8(b)(3) catchment basins(in areas not subject to flooding)designed to retain oil or return it to the facility,or <br /> rovide a uivalence as allowed by CFR 112.7(a)(2) <br /> Failed to equip the final discharge of all ditches with a diversion system that would retain oil in the <br /> 604 CFR 112.8(b)(4) facility in the event of an uncontrolled discharge if CFR112.8(b)(3)is not met, or provide equivalence as <br /> allowed by CFR 11 2.7a 2 <br /> Inspector: R iv By: Title: <br /> Thuy Tran (209) 468-8257 <br /> EHD 28-02 Rev 04/19/12 IrPa 2 APSA INSPECTION REPORT <br />