Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Facility VPPS 1004 Facility 3550 S. Hwy 99, Stockton Inspection Mar 23, 2011 <br /> Name: Address: Date: <br /> VIOLATIONS <br /> R HSC=CA Health and SafetyCode;CFR=Code of Federal Regulations;V=Violation;RV=Repeat violation <br /> # V v Code Section Specific requirements of HSC 25270.4.5(a)are identified as CFR code sections beginning with 112 <br /> Failed to:test each aboveground container for integrity on a regular schedule or when repairs were made, <br /> 48 CFR 112.8(c)(6) inspect containers and container supports;or keep records of inspections and tests,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 49 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils,or provide equivalence <br /> as allowed by CFR 112-7(a)(2) <br /> 50 CFR 112.8(c)(8) Failed to install and regularly test approved liquid level sensing devices,or provide equivalence as allowed <br /> by CFIR 112.7a 2 <br /> 51 CFR 112.8(c)(9) Failed to observe effluent treatment facility frequently enough to detect system upsets that could cause a <br /> discharge,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 52 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 53 CFR 112.8(c)(11) Failed to locate portable containers to prevent discharge or provide sufficient secondary containment <br /> capacity that will hold the volume of the largest container plus sufficient freeboard to contain precipitation <br /> Failed to provide buried piping with a protective wrapping and coating and cathodic protection and/or <br /> 54 CFR 112.8(d)(1) inspect buried piping for corrosion damage when exposed,or provide equivalence as allowed by CFR <br /> 112.7(a)(2) <br /> 55 CFR 112.8(d)(2) Failed to cap or blank-flange terminal connection at transfer point and mark its origin when piping is not in <br /> service or in standby service for an extended time,or provide equivalence as allowed by CFR 112.7(a)(2 <br /> 56 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion and corrosion and to allow for expansion and <br /> contraction,or provide equivalence as allowed by CFR 11 2.7a 2 <br /> 57 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances,or provide equivalence as <br /> allowed by CFR 11 2.7a 2 <br /> 58 CFR 112.8(d)(4) Failed to conduct integrity and leak test for buried piping at time of installation,modification,construction, <br /> relocation,or replacement,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 59 CFR 112.8(d)(5) Failed to provide adequate warnings to vehicles entering facility to protect aboveground piping and other <br /> oil transfer operations,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 999 Other. See attached"Continuation-Official Inspection Report"for violation(s)not listed above. <br /> ROUTINE ABOVEGROUND PETROLEUM STORAGE ACT (APSA) INSPECTION <br /> Violations: (7) <br /> 7. A copy of the Spill Prevention Countermeasure and Control (SPCC) Plan was not available at the time <br /> of inspection. The owner or operator must maintain a complete copy of the SPCC Plan at the facility if <br /> the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not <br /> attended, and have the Plan available for onsite review during normal business hours. Immediately <br /> locate a copy of the SPCC Plan for this facility and maintain a copy at or near the facility. Submit a copy <br /> of the SPCC Plan to the EHD for review by April 23, 2011. <br /> Complete and submit a copy of the Return to Compliance Certification to the EHD by April 23, 2011 along <br /> with a statement documenting the corrective actions that have been or will be taken for each violation and <br /> any supporting paperwork. <br /> Provided: Return to Compliance Certification form <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY <br /> RAA. FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME ATE 'S CURRENT HOURLY RATE. <br /> Inspector Phone: -ved By: T <br /> (209)468-3440 <br /> EHD ev 2/19110 t, Page 3 APSA INSPECTION REPORT <br />