Laserfiche WebLink
r i <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sogov.or /q ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> TESORO STOCKTON TERMINAL '209 466-8800 November 04, 2015 <br /> Facility Address: CERS ID: <br /> 3003 NAVY DR, STOCKTON CA 95206 10182187 <br /> Inspection Contact: Title: Phone: <br /> John Walker Manager, Terminals North 209 466-8800 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION -O eratinPermit 2834-AST FAC 1 M + 1 - </=10 M GAL CUMULATIVE <br /> Consent For: Consent Given By: <br /> 0 Inspection N Photos Z Sam les John Walker Manager, Terminals Northwest <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 u V ❑R c COS <br /> 102 HSC 25270.4.5(a) Failed to properly close a tank that is considered permanently closed ❑V ❑R ❑COS <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons ❑V ❑R ❑COS <br /> 104 HSC 25270.6(b) Failed to submit APSA fees ❑V ❑R ❑COS <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V ❑R ❑COS <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report ❑V ❑R ❑COS <br /> 107 HSC 25404(e)(4) Failed to report program data electronically ❑V ❑R ❑COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete ■V ❑R ❑COS <br /> 202 CFR 112.3(e)(1) Failed to maintain a copy of the Plan on site ❑V ❑R r:COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary ■V r R ❑COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments u V r R ❑COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments ❑V r R COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan ❑V ❑R ❑COS <br /> 603 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection, if applicable ❑V ❑R ❑COS <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers,transfer stations,and pipes ■V ❑R ❑COS <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout,operations discharge prevention methods and containers ❑V ❑R ❑COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge ❑V ❑R ❑COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ❑V ❑R ❑COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V ❑R ❑COS <br /> 609 CFR 112.7(c) Failed to provide secondary containment,diversionary structures,or equipment to prevent discharge ■V o R ❑COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability ❑V ❑R ❑COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response plan submitted ❑V ❑R ❑COS <br /> 612 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> Received Inspector: Phone: Date: <br /> (initial): STACY RIVERA, Senior REHS (209)468-3440 11/04/2015 <br /> Page 1 of 3 <br />