My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2041
>
2800 - Aboveground Petroleum Storage Program
>
PR0528425
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 12:04:28 PM
Creation date
10/16/2018 11:35:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528425
PE
2831
FACILITY_ID
FA0014324
FACILITY_NAME
LKQ OF STOCKTON
STREET_NUMBER
2041
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331015
CURRENT_STATUS
01
SITE_LOCATION
2041 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KCL u!N SAN JOAQUIN COUNTY <br /> Q: <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> c P,% Telephone: (209) 468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> OFFICIAL INSPECTION REPORT <br /> FACILITY NAME/TYPE: LKQ of Stockton DATE: Sep 26, 2011 <br /> ADDRESS: 2041 Navy Dr. CITY' Stockton ZIP CODE: 95206 <br /> OWNER/OPERATOR: Contact. Ian Hayes, Site Manager TELEPHONE#: 464-1111 X2021 <br /> TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION ❑X OTHER PROGRAM 2831 RECORD PR0528425 <br /> ELEMENT: ID#: <br /> NATURE OF COMPLAINT/CONSULTATION: <br /> This facility has 2045 gallons of aboveground petroleum storage capacity and is regulated under the <br /> Aboveground Petroleum Storage Act (APSA). <br /> Facilities with 1320 gallons or greater of APSA regulated shell capacity are required to prepare and <br /> implement a Spill Prevention Countermeasure, and Control (SPCC) Plan. <br /> OBSERVATIONS/COMMENTS: <br /> This facility has a Professional Engineer certified SPCC Plan on site with a date of May 19, 2011, <br /> CORRECTIVE ACTIONS: <br /> Maintain a current copy of the SPCC Plan on site at all times, and implement this Plan as necessary. <br /> CORRECT BY: <br /> INSPECTED <br /> RECEIVED BY: DATE: <br /> EHD 48-05 Rev.08/10/10 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.