My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BLACK DIAMOND
>
927
>
2800 - Aboveground Petroleum Storage Program
>
PR0515676
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 4:16:29 PM
Creation date
10/17/2018 11:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515676
PE
2832
FACILITY_ID
FA0003775
FACILITY_NAME
TIGER LINES INC
STREET_NUMBER
927
Direction
E
STREET_NAME
BLACK DIAMOND
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04903033
CURRENT_STATUS
01
SITE_LOCATION
927 E BLACK DIAMOND WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ RECEIVED <br /> NOV 0 9 2010 <br /> inems EIRONMENTAL HEALTH <br /> PERIVIMSERVICES <br /> 11/9/2010 <br /> Action taken by Tiger Lines to make correction to issues discovered in the 10/11/2010 inspection by Aris <br /> Cacapit at the Lodi Terminal. <br /> #8 Working with WGR Environmental, Health & Safety Consultants located at 315 West Pine Street, <br /> Suite 8, phone#209- 334-5363,James G. Neal to upgrade SPCC Plan to include 1,000 gal used oil tanks, <br /> 1000 gal motor oil tank, 200 gal oil tank, six 55 gal oil drums. <br /> #10 working with WGR to meet compliance of 5 year review and evaluation SPCC Plan. <br /> #18 page 4 A facility diagram has been provided for your review along with Hazardous Materials <br /> Inventory sheets. <br /> #19 page 4 Working with WGR Environmental to write new SPCC Plan. <br /> #20 page 4 Working with WGR Environmental to include handling procedures. <br /> #27 page 4 Working with WGR Environmental on writing new SPCC Plan. <br /> #32 page 3 WGR is in the process of providing Tiger Lines with an HW tank assessment for the used <br /> antifreeze tank. <br /> #33 page 5 A safety training meeting was conducted on 11/09/2010 for facility personnel that work <br /> with HW at the Tiger Lines Facility. A list of attendees and training program is provided for your review. <br /> #48 page 5 an inspection of facility for leakage is done daily by Shop Director Ken Delvaux. I have <br /> provided you with a sign off list that such action is being done. <br /> #49 page 3 &4 A safety training meeting was conducted on 11/09/2010 for facility personnel that work <br /> with HW at the Tiger Lines Facility. A list of attendees and training program is provided for your review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.