My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
2800 - Aboveground Petroleum Storage Program
>
PR0515766
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 1:54:21 PM
Creation date
10/17/2018 12:00:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515766
PE
2832
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
01
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EtV.EU- <br /> fforda—T� Q-et Fax:.(209)744-01162 <br /> a r .net <br /> TP 201.3B <br /> AST Static Pressure Performance T� ACTH <br /> nElART <br /> Permit Number:N-4986 CONF# 17-23314 Test Company:AFFORDA-TE$T <br /> Site Name: CAL-TRANS - STOCKTON Technician: ZANE NIMMO <br /> Site Address: 1604 S. B STREET Certification Number Expiration Date <br /> City: STOCKTON Zip:95208 District:40083 <br /> Date/Time of Test:3/3/2017 <br /> TEST INFORMATION <br /> Total number of nozzles: 1 Are the tanks manifolded? ❑ Yes Z No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) I G-70-152 <br /> Phase I vapor recovery system configuration ® 2-point ❑ coaxial <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) EXEMPT <br /> Nitrogen introduction point ® Phase I vapor coupler ❑ Phase I vent line ❑ Phase H vapor riser <br /> Pressure measuring device ❑ incline manometer ® digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) 1/13/2017 <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c.or less) .00 <br /> Nitrogen introduction flow rate,F(must be between 1 and 5 CFM) 2 CFH <br /> Number of hoses with over 100 ml(balance hoses must be drained prior to testing) 0 <br /> TANK INFORMATION <br /> Tank No. 1 2 3 4 ALL <br /> Product grade E85 <br /> Actual tank capacity(gallons) 9,591 <br /> Gasoline volume(gallons) 6,146 <br /> Ullage(gallons)' 3,445 <br /> If tanks are not manifolded,number of nozzles I I <br /> 2 IN. W.C. STATIC PRESSURE TEST <br /> Test No. 1 2 3 4 5 <br /> Start time 1015 <br /> Initial Pressure,inches of water column(in.w.c.) 2.00 <br /> Pressure at one minute,in.w.c. 1.97 <br /> Pressure at two minutes,in.w.c. 1.94 <br /> Pressure at three minutes,in.w.c. 1.92 <br /> Pressure at four minutes,in.w.c. 1.91 <br /> Pressure at five minutes,in.w.c. 1.90 <br /> Allowable minimum pressure,in.w.c. 1.60 <br /> Pass/Fail PASS <br /> NOTE: 'The minimum ullage during the test shall be 25 percent of the tank capacity or 300 gallons,whichever is greater. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and <br /> information provided in this document are true,accurate,and complete. <br /> Signature of Technician: Date: 3/3/2017 <br /> Ver. 1.2—08.05.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.