Laserfiche WebLink
Spill Prevention Control and Countermeasure Inspection <br />Findings, Alleged Violations, and Proposed Penalty Form <br />These Findings, AIleged Violations and Penalties are issued by EPA Region 9 under the authority vested in the <br />Administrator of EPA by Section 311(b)(6)(B)(1) of the Clean Water Act, as amended by the Oil Pollution Act of 1990. <br />Company Name: <br />Docket Number: <br />Bullfrog Landing MarinaSPCC-09-2019- <br />Facility Name: <br />Bullfrog Landing Marina <br />Date: <br />May 31, 2018 <br />J��ZD S1,gT�s <br />Address: <br />Inspection Number:Q <br />17251 Bacon Landing Road <br />18-4013 <br />ql <br />City: <br />Stockton <br />State: Zip Code: <br />CA 95219 <br />Contact: <br />Name: <br />.lance Witul <br />EPA Approving Official: <br />[Amy C. Miller, Acting Director — Enforcement Division <br />Enforcement Contact: <br />David Ressa, Owner == I Janice Witul <br />Summary of Findings <br />(Bully Storage Facilities) <br />GENERAL TOPICS: §112.3(a), (d), (e); §112.5(a), (b), (c); §112.7 (a), (b), (c), (d) <br />(When the SPCC Plan review penalty exceeds $1,500.00 enter only the maximum allowable of $1,500.00.) <br />❑ No Spill Prevention Control and Countermeasure Plan -112.3 ...................... . .................... . ....... $1,500.00 <br />❑ Plan not certified by a professional engineer - 112.3(d)............................................................... 450.00 <br />❑ Certification lacks one or more required elements - 112.3(d)(1).... I ........................................ I....... 100.00 <br />❑ Plan not maintained on site (if manned at least four (4) hrs]day) or not available for review - 112.3(e)(1)....300.00 <br />❑ No plan amendment(s) if the facility has had a change in: design, construction, operation, <br />or maintenance which affects the facility's discharge potential - 112.5(a) .......................................... 75.00 <br />■ No evidence of five-year review of plan by ownerfoperator - 112.5(b) ............................................... 75.00 <br />❑ Amendment(s) not certified by a professional engineer - 112.5(c)...................................................150.00 <br />❑ No management approval of plan - 112.7................................................................................450.00 <br />❑ Plan does not follow sequence of the rule and/or cross-reference not provided - 112.7 ...........................150.00 <br />❑ Plan does not discuss additional procedures/methods/equipment not yet fully operational - 112.7 ...............75.00 <br />❑ Plan does not discuss conformance with SPCC requirement - 112.7(a)(1) ..................................................75.00 <br />❑ Plan does not discuss alternative environmental protection to SPCC requirements - 112.7(a)(2) ..................200.00 <br />