Laserfiche WebLink
BULK STORAGE CONTAINERS: § 112.7(i), §112.8(c) and/or §112.12(c) <br />❑ <br />Failure to conduct evaluation of field -constructed aboveground containers for risk of discharge or <br />failure due to brittle fracture or other catastrophe - 112.7f i) .........................................................................300.00 <br />■ <br />Material and construction of containers not compatible with the oil stored and the conditions of storage <br />such as pressure and temperature - 112.8(c)(1).........................................................................450.00 <br />■ <br />Secondary containment capacity is inadequate - 112.8(c)(2).........................................................750.00 <br />❑ <br />Secondary containment systems are not sufficiently impervious to contain oil - 112.8(c)(2) .................. <br />375.00 <br />❑ <br />CompleteIy buried metallic tanks are not protected from corrosion or are not subjected to <br />regular pressure testing -I12.8(c)(4).................................................................................... <br />150.00 <br />❑ <br />Buried sections of partially buried metallic tanks are not protected from corrosion - 112.8(c)(5) ............. <br />150,00 <br />❑ <br />Above ground containers are not subject to periodic integrity testing techniques such as <br />visual inspections, hydrostatic testing, or other nondestructive testing methods - 112.8(c)(6) ..................450,00 <br />❑ <br />Above ground tanks are not subject to visual inspections - 112.8(c)(6).... ......................................... <br />450.00 <br />❑ <br />Records of inspections (or customary business records) do not include inspections of container <br />supports/foundation, signs of container deterioration, discharges and/or accumulations of oil <br />inside diked areas - 112.8(c)(6)........................................................................................... <br />75.00 <br />❑ Steam return /exhaust of internal beating coils that discharge into an open water course are <br />not monitored, passed through a settling tank, skimmer, or other separation system - / 12.8(c)(7) ............. 150.00 <br />❑ Container installations are not engineered or updated in accordance with good engineering practice <br />because none of the following are present - 112.8(c)(8).............................................................................450.00 <br />- high liquid level alarm with audible or visual signal, or audible air vent - 112,8(c)(8)(i) <br />- high liquid level pump cutoff devices set to stop flow at a predetermined level - 112.8(c)(8)(ii) <br />- direct audible or code signal communication between container gauger and pumping station - 112.8(c)(8)(iii) <br />- fast response system for determining liquid Ievel of each bulk storage container, or direct vision gauges <br />with a person present to monitor gauges and the overall filling of bulk storage containers - 112.8(c)(8)(iv) <br />❑ No testing of liquid level sensing devices to ensure proper operation - 112.8(c)(8)N)............................ 75.00 <br />❑ Effluent treatment facilities not observed frequently to detect possible system upsets that could cause a <br />discharge as described in § 112.1(b) - 112.8(c)(y) .....................................................................150.00 <br />❑ Causes of leaks resulting in accumulations of oil in diked areas are not promptly corrected - 112.8(c)(10)..450.00 <br />❑ Mobile or portable storage containers are not positioned or located to prevent discharged oil from <br />reaching navigable water, or have inadequate secondary containment - 112.8(c)(I I) ...........................150.00 <br />❑ Secondary containment inadequate for mobile or portable storage tanks - 112.8(c)(l 1) ........................500.00 <br />❑ Plan has inadequate or no discussion of bulk storage tanks...........................................................75.00 <br />Page 5 of 6 <br />