Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for A A & BOB ALLEN INC as of May 07, 2018. <br /> Open violations from November 13, 2017 inspection <br /> Violation#102 - Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA) regulated shell capacity greater than 10,000 <br /> gallons. A Spill Prevention, Control, and Countermeasure (SPCC) Plan was not available on site. All facilities which <br /> have an APSA regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets <br /> all of the requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance <br /> with 40 CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112, which that includes <br /> all aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer <br /> (PE) certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.)A copy <br /> shall be maintained on site at all times. <br /> Violation#106 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on November 15,2013 and an inspection report was issued identifying information to <br /> be submitted to bring this site into compliance.The past violation includes"Failure to prepare a written SPCC Plan <br /> in accordance with CFR Part 112."This information was required to be submitted within 30 days. This information <br /> has not been received resulting in a non-compliant status for this facility.An operator that receives an inspection <br /> report shall have 30 days to submit a written response that includes a statement documenting corrective actions <br /> taken or proposing corrective actions which will be taken. Ensure that a written response documenting corrective <br /> actions taken or proposed is submitted within 30 days of receiving an inspection report. <br /> Open violations from November 15, 2013 inspection <br /> Violation#101 -Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> Facility failed to provide a Spill Prevention Contol Counter-measure (SPCC) Plan in accordance to CFR Partt 112. <br /> Immediately provide SPCC plan. Further information can be found on the EHD website; a copy of schedule of SPCC <br /> free classes has been provided to owner during this inspection. <br /> Page 1 of 1 <br />