My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRUELLA
>
24124
>
2800 - Aboveground Petroleum Storage Program
>
PR0535679
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2018 10:58:51 AM
Creation date
10/17/2018 3:03:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535679
PE
2831
FACILITY_ID
FA0003795
FACILITY_NAME
LIBERTY RURAL FIRE DISTRICT
STREET_NUMBER
24124
Direction
N
STREET_NAME
BRUELLA
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00731024
CURRENT_STATUS
01
SITE_LOCATION
24124 N BRUELLA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Liberty Fire District 24124 Bruella Rd . Acampo , CA 95220 <br /> CONTAINMENT ' <br /> A SOLUTIONS <br /> A DLNALI COMPANY <br /> ` LISTED <br /> .. UL 2085 <br /> INSULATED SECONDARY CONTAINMENT ABOVEGROUND TANK FOR <br /> FLAMMABLE AND COMBUSTIBLE LIQUIDS , <br /> N0 . N 0L%&jWj& PLANT ID JOB N0. <br /> SINGLE COMPARTMENT TANK <br /> TWO COMPARTMENT TANK <br /> SINGLE COMPARTMENT TANK CAPACITY GALLONS <br /> COMPARTMENT TANK <br /> FIRST COMPARTMENT CAPACITY GALLONS <br /> SECOND COMPARTMENT CAPACIT ._ice GALLONS <br /> MODEL MANUFACTURED <br /> THE SINGLE COMPARTMENT PRIMARY TANK REQUIRES EMERGENCY RELIEF <br /> VENTING CAPACITY OF CUBIC FEET PER HOUR <br /> THE TWO COMPARTMENT TANK REQUIRES <br /> CUBIC FEET PER HOUR FIRST COMPARTMENT <br /> CUBIC FEET PER HOUR SECOND COMPARTMENT <br /> THE ANNULAR SPACE REQUIRES EMERGENCY VENTING CAPACITY OF <br /> CUBIC FEET PER HOUR <br /> THIS TANK SHALL BE INVESTIGATED TO DETERMINE ACCEPTABILITY <br /> FOR USE AFTER FIRE EXPOSURE DAMAGE , OTHER PHYSICAL DAMAGE, <br /> OR MISUSE-, BALLISTIC RESISTANT ; VEHICLE IMPACT RESISTANT. <br /> PRESSURIZE PRIMARY TANK WHEN PRESSURE TESTING ANNULAR SPACE. <br /> THIS TANK IS INTENDED FOR INSTALLATION IN ACCORDANCE WITH <br /> ' NFPA 30 . 30A, 31 OR UFC . FOLLOW INSTALLATION INSTRUCTIONS <br /> Page 3 of 3 Photo taken on 10-19-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.