My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2800 - Aboveground Petroleum Storage Program
>
PR0536398
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2019 3:29:36 PM
Creation date
10/17/2018 3:03:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0536398
PE
2831
FACILITY_ID
FA0010413
FACILITY_NAME
CROP PRODUCTION SVCS - STKN
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />r -+ENVIRONMENTAL HEALTH DEPARTMENT <br />;•.�� '� 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />� FpRj <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: Crop Production Services <br />DATE: ,Jun 24, 2011 <br />ADDRESS: 1905 N. Broadway, Stockton <br />CITY: Stockton <br />ZIP CODE: 95205 <br />OWNER/OPERATOR: Greg Selna <br />TELEPHONE #. 466-7021 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION ❑X OTHER <br />PROGRAM 2831 <br />ELEMENT: <br />RECORD TBA <br />ID#: <br />NATURE OF COMPLAINT/CONSULTATION: <br />Facility found to have a petroluem shell capacity above 1,320 gallon during a Routine hazardous <br />waste inspection. <br />OBSERVATIONS/COMMENTS: <br />HSC 25270.4.5(a) - This facility does not have a completed SPCC (Spill Contingency <br />Countermeasure Management) Plan in accordance to CFR Part 112. <br />CORRECTIVE ACTIONS: <br />Prepare a SPCC Plan and retain a copy on site. The current due date for SPCC Plan is November <br />20, 2011. <br />Note: Information on SPCC and APSA (Aboveground Petroleum Storage Act) can be found on the <br />EHD website: <br />hftp-//www-sjgov.org/ehd/Programs/Others/apsa.htm <br />CORRECT BY: <br />INSPECTED BY: <br />RECEIVED BY: <br />/ / <br />DATE: ( _ % �1 ' <br />/ 12-q ho I <br />EHD 48-05 Rev. 08/10/10 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.