Laserfiche WebLink
ENGECY <br /> GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS <br /> I N C O R P O R A T E D MATERIALS TESTING <br /> Project No. <br /> 4203-F1 <br /> October 8, 1996 <br /> Mr. Robert Fowler <br /> Frank C. Alegre Trucking Company, Inc. <br /> 5100 West State Route Hwy 12 � <br /> Lodi, CA 95242 x <br /> C:) - <br /> Subject: Former Trucking Facility <br /> 802 North Cluff <br /> Lodi, California 'z <br /> SOIL REMEDIATION WORK PLAN c;'am <br /> tv <br /> M <br /> Dear Mr. Fowler: <br /> ENGEO Incorporated is pleased to present this work plan for soil remediation at the former waste oil <br /> tank location, located on the subject property in Lodi, California (Figure 1). Soil contamination was <br /> discovered.during recent excavations on the property. The proposed scope of services includes the <br /> following: <br /> • Observation of the excavation of petroleum contaminated soils within the area of the former 500- <br /> gallon waste oil tank. <br /> • Removal of remnant piping associated with the former tank, if discovered. <br /> • Field screening of soils for petroleum hydrocarbons using a photoionization. detector and <br /> colorimetric screening tubes. <br /> • Recovery of confirmation soil samples from the base and sidewalls of the excavation. <br /> • Recovery of composite soil samples from the excavated soil stockpile. <br /> • Laboratory analysis of the discrete and composite soil samples. <br /> • Preparation of a soil remediation report summarizing field and laboratory work with conclusions <br /> and recommendations for further remediation/characterization, if necessary. <br /> 2401 Crow Canyon Road•Suite 200•San Ramon,CA 94583-1545•(510)838-1600•.Fax(516)838-7425 <br /> E-mail:engstaff@engeo.com•WWW:http://www.hooked.net/engeo <br /> i <br />