Laserfiche WebLink
ENGEO <br /> GEOTECHNICAL.AND-ENVIRONMENTAL CONSULTANTS <br /> I N C O RPO RATE D MATERIALS TESTING <br /> to. 59 <br /> Project No. <br /> 4203-F3 <br /> March 25, 1997 <br /> Mr. Robert Fowler <br /> Frank C. Alegre Trucking Company,Inc. <br /> 5100 West State Route Highway 12 <br /> Lodi, CA 95242 <br /> Subject: Former Trucking Facility <br /> 802 North Cluff <br /> Lodi, California <br /> WORK PLAN FOR MONITORING WELL INSTALLATION <br /> Reference: ENGEO Inc.; Report on Soil Excavation and Mitigation, Former Trucking Facility, <br /> 802 North Cluff, Lodi, California; December 10, 1997. <br /> Dear Mr. Fowler: <br /> As requested, ENGEO has prepared this work plan for the installation of a ground-water <br /> monitoring well at the subject property, located in Lodi, California. The well installation was <br /> requested by the San Joaquin County Environmental Health Division. <br /> The proposed scope of services includes: <br /> i • Drilling of one X50-foot-deep, 81/4-inch-diameter soil boring with soil sampling <br /> • Geologic logging and field vapor screenings <br /> • Installation and development of one f50-foot-deep, 2-inch-diameter ground-water monitoring <br /> well <br /> • Purging and recovery of a ground-water sample from the well <br /> • Laboratory analysis of the soil and ground-water samples for petroleum hydrocarbons and <br /> VOCs <br /> • Preparation of a report summarizing the results of the current and previous investigations <br /> 2401 Crow Canyon Road•Suite 200.•San Ramon,CA 94583-1545•(510)838-1600•Fax(510)838-7425 <br /> E-mail:engstaff@engeo.com •WWW:http://www.hooked.net/engeo <br /> i� <br />