Laserfiche WebLink
l <br /> Frank C. Alegre Trucking Company, Inc. „ 4203-F3 <br /> Former Trucking Facility March 25, 1997 <br /> WORK PLAN FOR MONITORING WELL INSTALLATION Page 3 <br /> I� <br /> Forty-eight hours after development,the monitoring well will be purged and a ground-water sample <br /> 11 <br /> will be recovered for laboratory analysis. Ground-water sampling protocol details are provided in <br /> Appendix B. <br /> Following completion of the monitoring well, we will prepare')the Department of Water Resources <br /> Well Installation Form to be submitted to the county and state.',, <br /> Laboratory Testing <br /> The soil and ground-water samples from the proposed monitoring well wi11 be analyzed for total <br /> volatile/extractable hydrocarbons (EPA mod 8015), BTEX, and volatile organics (EPA 8260). <br /> Laboratory analysis will be performed by American Environmental Network in Pleasant Hill, , <br /> California. <br /> Report Preparation <br /> After an analysis of the laboratory test results from the soil land ground-water sampling, we will <br /> prepare a report documenting our findings. The report will be prepared under the direct supervision <br /> r of, and will be signed by, a Certified Hydrogeologist. The reportwill include an analysis of the <br /> data collected and will provide conclusions and recommendations regarding the property. <br /> We are pleased to be of continued service to you regarding thi's project. If you have any questions <br /> regarding the work plan,please do not hesitate to contact our office. <br /> i <br /> Very truly yours, <br /> ENGEO INCORPORATED Reviewed by: <br />'F Shawn Munger /JeaneunsCHG 413 esident <br /> RG 5810 PE 1990611 <br /> �r <br /> i. <br /> sm/ce:gwm { <br /> Attachments: Figure 1 f <br /> Ground-Water Sampling Protocol <br /> Laboratory Procedures <br /> ' Site Health and Safety Plan <br /> cc: 1 - San Joaquin County, Ms. Margaret Lagorio <br /> r <br /> II ` <br /> i <br />