Laserfiche WebLink
CERTIFICATION PAGE <br /> I hereby certify that, being familiar with 40 CFR Part 112, a WGR employee has visited <br /> and examined the facility and reviewed the Spill Prevention Control and <br /> Countermeasures (SPCC) Plan for the Ford Construction Company Inc., Cluff <br /> Maintenance Yard. This SPCC Plan has been prepared in accordance with good <br /> engineering practices, including consideration of applicable industry standards, and the <br /> requirements of 40 CFR Part 112. Procedures for required inspections and testing have <br /> been established. The plan is adequate for the facility. <br /> Tore B. Pearson, P.E. @FES <br /> '! e lRo <br /> fess* nal End® <br /> ; <br /> (Signature) 29385g3 <br /> �D A)U V CIVIL <br /> QRCAL6Fd�`'eP <br /> (Date) <br /> Registration No. C29585 State of California <br /> MANAGEMENT APPROVAL <br /> This SPCC Plan will be implemented as herein described. <br /> RADesigg-nate <br /> SPerson <br /> Page iv <br />