Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sj_oq v_org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ELON INC 17333 S COMCONEX RD, MANTECA November 20, 2014 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V o R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V o R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V o R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V o R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> ! (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 101 HSC 25270.4.5(x) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA) regulated shell capacity of 10,400 gallons. A Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan was not available on site. All facilities which have an APSA <br /> regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112,which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer(PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) Acopy shall be <br /> maintained on site at all times. This is a Class II violation. <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons. <br /> A tank facility statement or business plan has not been submitted. A tank facility statement identifying the name and <br /> address of the tank facility, a contact person for the tank facility, the total storage capacity of the tank facility, and the <br /> location, size, age, and contents of each storage tank that exceeds 10,000 gallons in capacity and that holds a <br /> substance containing at least 5 percent of petroleum shall be submitted annually. Submittal of a business plan satisfies <br /> the requirement to submit a tank facility statement. Immediately submit a tank facility statement or business plan. This <br /> is a Class II violation. <br /> 107 HSC 25404(e)(4) Failed to report program data electronically. <br /> A submission to the California Electronic Reporting System(CERS)for the Aboveground Petroleum Storage Act <br /> (APSA) program has not been made. Beginning January 1, 2013, all businesses are required to submit all new(or any <br /> changes to existing)Aboveground Petroleum Storage Act(APSA) information online to the CERS at <br /> hftp://cers.calepa.ca.gov. Be sure to include your APSA activity in the Businesses Activities section in CERS in <br /> addition to any other relevant activities and required fields. This is a Class II violation. <br /> Overall Inspection Comments: <br /> The site inspection was conducted on November 20, 2014 and the inspection report was mailed to the property <br /> owner on December 3, 2014. Complete and submit a copy of the Return to Compliance Certification form to the <br /> EH with a statement documenting the corrective actions that have been or will be taken for each violation, and <br /> any supporting paperwork, 30 days from receipt of this inspection report. <br /> Received by(initial): Inspector: Phone: Date: <br /> ,c <br /> 11�of dw � ELENA MANZO, REHS (209)953-7699 11/20/2014 <br /> toy 4 <br />