My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
2800 - Aboveground Petroleum Storage Program
>
PR0528333
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 9:22:32 AM
Creation date
10/18/2018 11:56:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528333
PE
2831
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
01
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 y <br />1.0 INTRODUCTION <br />The U.S. Environmental Protection Agency (EPA) under the Code of Federal Regulations (CFR) <br />Title 40, Part 112 — Oil Pollution Prevention, requires oil storage facilities with underground <br />capacity greater than 42,000 gallons, above ground capacity greater than 1,320 gallons, or above <br />ground capacity in one container greater than 660 gallons to prepare a Spill Prevention Control and <br />a Countermeasure (SPCC) Plan. <br />C . <br />This SPCC Plan was prepared in accordance with the above requirement. The purpose of this plan is <br />to: <br />E <br />1. Prevent the occurrence of product spills by the use of sound engineering and <br />management controls. <br />2. Prevent the discharge of product into navigable waters of the United States. <br />3. Prevent exposure to personnel and the community. <br />4. Prevent contamination of the environment. <br />This plan presents guidance and direction to Holt of California (Holt) operating personnel for <br />prevention of and effective response to product releases. Holt has committed the necessary resources <br />for implementation of the procedures described in this document. In preparing this plan, Holt is <br />demonstrating its obligations to the public for responsible environmental stewardship. This plan also <br />meets the requirements of the Holt Environmental Policy ensuring employees are aware of applicable <br />environmental issues and requirements, and to support Holt in protecting the environment. <br />Holt of California SPCC Plan <br />1521 West Charter Way <br />Stockton, California <br />Page 1 <br />September 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.