My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
2800 - Aboveground Petroleum Storage Program
>
PR0528333
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 9:22:32 AM
Creation date
10/18/2018 11:56:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528333
PE
2831
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
01
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />).• .fie- •.pG <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />4CiFORd <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: Holt of California <br />DATE: Feb 9, 2011 <br />ADDRESS: 1521 W. Charter Way <br />Cn�r: Stockton <br />ZIP CODE: 95206 <br />OWNERIOPERATOR: Manager: Richard Silva <br />TELEPHONE #: (209)466-2000 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION ❑X OTHER7 <br />E OGRANMENT'. 2831 <br />E ORD PR0528333 <br />NATURE OF COMPLAINT/CONSULTATION: <br />Facility has 9065 gallons of aboveground petroleum storage shell capacity and as such, is regulated <br />under the Aboveground Petroleum Storage Act (APSA). All APSA regulated facilities with >1320 <br />gallons of APSA regulated shell capacity shall prepare and implement a Spill Prevention <br />Countermeasure and Control (SPCC) Plan. <br />OBSERVATIONS/COMMENTS: <br />This facility has a Professional Engineer certified SPCC Plan on site with a date of July 2006. <br />CORRECTIVE ACTIONS: <br />Maintain and implement a current version of the SPCC Plan for this facility on site at all times. <br />CORRECT BY: NIA <br />INSPECTED��/ <br />RECEIVED BY: / I <br />DATE: 22C <br />EHD 48-05 Rev. 08/10/10 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.