My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2800 - Aboveground Petroleum Storage Program
>
PR0528482
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 3:47:41 PM
Creation date
10/18/2018 11:59:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528482
PE
2832
FACILITY_ID
FA0009268
FACILITY_NAME
CHEROKEE FREIGHT LINES
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-1120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 REQUIRED IMPROVEMENTS <br />crrrfply with the SF'C'C regulations in 40 CFR I t-'• the following improvements are required: <br />All ��_,,allon �j�n�s containing oil products (Drums I-6 and 10-17) located in the Facility must be <br />ent to hold at least 55 gallons. [ 112.7(c)] <br />eduipped with secondary containm <br />Tani. 11 should be moved away froth the wall of the storage shed to allow visual inspection of all <br />sides ofthe tank. [112. 8(c)(6)] <br />The Gasoline tank (Tank 7) requires additional secondary containmcnt in the am(-)unt of 367 - <br />gallons, or approximately 50 cubic feet. [I 12.7(c)] <br />he used 250 -gallon Skim frorn OWS (Tank 10) and the used antifreeze tank (Tank 6) must be <br />t to hold 250 gallons (each). Once this required improvement <br />equipped with secondary containmen <br />is completed, the tanks should be covered in order to minimize the precipitation accumulation in the <br />secondary containment. Alternatively, the secondary contarnnuunt can be constructed to allot <br />sufficient freeboard for precipitation. [1 12.7(c)] <br />P <br />��LN j ✓`F i—e r'I "j- �ti-P'4—e�z v�. � �eM'�� I � Ml..� <br />
The URL can be used to link to this page
Your browser does not support the video tag.