Laserfiche WebLink
Cherokee Freight Lines, 5463 E. Cherokee Rd, Stockton, CA 95215 Record ID PR0528482 <br />1/13/17 <br />PHOTO # 1 <br />The SPCC Plan included a section for "Required Improvements," including upgrades to secondary containment; many of these items have not been <br />implemented by the facility, and none of them have been certified by a Drofessional engineer. <br />REQUIRED IMPROVEMENTS <br />r<' comply with the SPCC regulations in 40 CFR 112, the following improvements are required: <br />• All 55 -gallon drums containing oil products (Drums 1-6 and 10-17) located in the Facility must be <br />equipped with secondary containment to hold at least 55 gallons. [I 12.7(c)] <br />goo Tank I I should be moved away from the wall of the storage shed to allow visual inspection of all <br />sides of the tank. [I 12.8(c)(6)] <br />• The Gasoline tank (Tank 7) requires additional secondary containment in the amount of 3b7- <br />gallons, or approximately 50 cubic feet. [I 12.7(e)] <br />• The used 250 -gallon Slam from DWS (Tank 10) <br />and the used antifreeze tank (Tank 6) must be <br />cx'u,pped with secondary containment to hold 250 gallons (each). Once this required improvement <br />c�rjmpleted, the tanks should be covered in order to minimize the precipitation accumulation int <br />-(jrjdar`.- containment. Alternatively, the secondary contaim <br />nent can be constructed to he <br />1ffic�! n? freeboard f6r precipitation. [112.7(c)] alloy; <br />Stacy Rivera, RENS Page 1 of 9 <br />V <br />Z <br />b <br />ti <br />r <br />r' <br />