My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2800 - Aboveground Petroleum Storage Program
>
PR0528482
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 3:47:41 PM
Creation date
10/18/2018 11:59:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528482
PE
2832
FACILITY_ID
FA0009268
FACILITY_NAME
CHEROKEE FREIGHT LINES
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-1120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Aaron Hang [EH] <br />From: Steve Gannon <SGannon@gocfl.com> <br />Sent: Wednesday, June 28, 2017 8:14 AM <br />To: Aaron Hang [EH] <br />Subject: SPCC Inspection <br />Attachments: tank inspections.pdf; slab.JPG <br />Follow Up Flag: Follow up <br />Flag Status: Flagged <br />Good morning Aaron, Sorry for the delay, been waiting for the contractor to resume work on the containment slab. They <br />wouldn't work last week because of the heat. The slab and containment wall have been poured and they will be <br />reassembling the oil skimmer and new 1000 gal tank hopefully this week. I talked to Condor environmental again and <br />they assured me that since the new oil tanks were built to the UL142 standards, visual inspections should be sufficient. I <br />am sending a copy of the most recent inspections for your review. It is up to you if that is acceptable, please let me <br />know. <br />The work is starting next week on the containment for the 10k and 8k diesel tanks. We are using the same contractor <br />that poured the slab and containment wall for the oil skimmer. I will send you pictures as soon as it is completed. I have <br />talked to the contractor about getting the job completed as soon as possible so we can be back in compliance. Thank <br />you for your patience, these contractors seem to work on their own schedules and don't have the same sense of <br />urgency that we do. <br />Thank You, Steve <br />Steven Gannon <br />Cherokee Freight lines <br />5463 Cherokee Rd <br />Stockton, CA 95215 <br />steveCcDRocfl.com <br />209-444-7325 <br />
The URL can be used to link to this page
Your browser does not support the video tag.