Laserfiche WebLink
Con-Fab California Corporation RECEIVED <br /> JAN 12 2011 <br /> MENTAL <br /> To: Thuy Tran, Environmental Health Inspector ENVII E MI SERVICESLTH <br /> From: Rigo Garcia <br /> Date: 1/11/11 <br /> CC: Ziad Sakkle, Justin Palmaymesa, Debbie Weddle <br /> Re: Routine Hazardous Waste Inspection — Minor Violations #1, #7, #52 <br /> In response to violation # 1, 1 have prepared and generated a written Self- <br /> Certified SPCC Plan in accordance with CFR Part 112. (Using the EHD Template <br /> Web site) <br /> Said Plan was reviewed and approved by management. A copy of the Con-Fab <br /> SPCC Plan was Fed-X to the Environmental Health Dept. to the attention of <br /> Inspector Thuy Tran on 12/28/10. <br /> In response to violation # 7, Con-Fab is now in compliance with CFR Part 112.3. <br /> A copy of the Con-Fab SPCC Plan is in place at the facility. <br /> In response to violation # 52, Visible discharges in the Oil Storage shed has been <br /> cleaned-up. Spillages of petroleum oil and waste absorbent saw dust has also <br /> been cleaned and removed form the floor. Oil Storage shed shall be kept clean <br /> and inspected on a monthly schedule. <br /> Corrective action for the form release oil and water condensation has been <br /> corrected. (Ref. Violation no.'s #20 and #27 respectfully) <br /> iw 44_11__ <br /> Rigo Garcia <br /> Stores Controller <br /> (209) 249-4719 <br /> Cell (209) 629-2768 <br /> rigog@confabca.com <br />