Laserfiche WebLink
Page 1 of 1 <br /> Aris Cacapit [EH] <br /> From: Aris Cacapit[EH] <br /> Sent: Wednesday, December 01, 2010 4:34 PM <br /> To: 'Paul Precissi' <br /> Subject: RE: SPCC <br /> Hi Don, <br /> If you conform to the following criteria, you may use a Tier I template for your SPCC plan. Otherwise, a P.E. certified <br /> plan is required for facilities with greater than 10,000 gallons of petroluem storage capacity. <br /> To meet the Tier I applicability criteria, the facility must have: <br /> a. a total aboveground oil storage capacity of 10,000 U.S. gallons or less; <br /> b. no aboveground oil storage containers with a capacity greater than 5,000 U.S. gallons; and <br /> c. in the 3 years prior to the date the SPCC Plan is certified, had no single discharge of oil to navigable waters or <br /> adjoining shorelines exceeding 1,000 U.S. gallons, or no two discharges of oil to navigable waters or adjoining <br /> shorelines each exceeding 42 U.S. gallons within any 12-month period.* <br /> "Please note: this does not include discharges that are the result of natural disasters, acts of war, or terrorism. When <br /> determining the applicability of this SPCC reporting requirement, the gallon amount(s)specified (either 1,000 or 42) <br /> refers to the amount of oil that actually reaches navigable waters or adjoining shorelines not the total amount of oil <br /> spilled. EPA considers the entire volume of the discharge to be oil for the purposes of these reporting requirements. <br /> http:/IWW W.pPa.gov/emergencies/content/spcc/tierl temp_.htm <br /> Thank you, <br /> Aris Cacapit, REHs <br /> San Joaquin County Environmental Health Department <br /> 600 E. Main St. <br /> Stockton, CA 95202 <br /> desk 209 468-3453 <br /> fax 209 468-3433 <br /> email acacapt@sjcehd.com <br /> From: Paul Precissi [maiIto:precissiflying@gmaiI.com] <br /> Sent: Tuesday, November 23, 2010 10:48 AM <br /> To: Aris Cacapit [EH] <br /> Subject: SPCC <br /> Aris, <br /> I received your email with regards to our plan. I have reviewed the links and I see what needs to be <br /> done. Beginning Monday I will work on the amended plan based on the template provided in the link. <br /> Thank you, <br /> Don A. Precissi <br /> Precissi Flying Service <br /> 12/1/2010 <br />