My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
11919
>
2800 - Aboveground Petroleum Storage Program
>
PR0521780
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 2:43:08 PM
Creation date
10/19/2018 9:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521780
PE
2831
FACILITY_ID
FA0003731
FACILITY_NAME
PRECISSI FLYING SERVICE
STREET_NUMBER
11919
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05902047
CURRENT_STATUS
01
SITE_LOCATION
11919 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.s'qov.org/ehd <br /> ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Facility Precissi Flying Service Addr�: 11919 Lower Sacramento Rd. Lodi Date <br /> Aug 6, 2010 <br /> Name: <br /> VIOLATIONS <br /> # V v Code Section HSC=CA Health and SafetyCode,CFR=Code d Federal Regulations;V=Violation;RV=R violation <br /> Specific requirements or HSC 25270.4.5(a)are identified as CFR code sections beginning with 112 <br /> 27 CFR 112.7(b) SPCC Plan failed to include a description of potential equipment failure(direction,flow rate,quantity),or <br /> provide equivalence as allowed by CFR 112.7(a)(2) <br /> 28 CFR 112.7(c) Failed to provide secondary containment and/or diversionary structures that are capable of containing <br /> discharge from primary containment until it is cleaned u <br /> Failed to provide explanation,conduct periodic integrity testing of containers and/or periodic integrity and <br /> 29 CFR 112.7(d) leak testing for valves and piping if containment or discharge prevention structures were determined to be <br /> impracticable on an SPCC Plan or sections of one that is PE certified <br /> If a response plan was not submitted to the RA,and containment or discharge prevention structures were <br /> 30 CFR 112.7(d) determined to be impracticable,the SPCC Plan failed to provide:(1)an oil spill contingency plan;(2) <br /> written commitment of manpower,equipment,materials to control and remove oil discharge <br /> 31 CFR 112.7(e) Failed to conduct inspections and tests in accordance with written procedures and/or maintain signed <br /> records of inspections and tests as required by the facility's SPCC Plan on site for 3 years <br /> 32 CFR 112.7(f) Failed to:(1)train personnel on discharge prevention;(2)designate a person to be accountable for <br /> discharge prevention;or 3 schedule prevention discharge prevention briefings at least annual) <br /> Failed to describe how the oil handling,processing and storage areas are secured and controlled;how <br /> 33 CFR 112.7(g) master flow and drain valves are secured;how unauthorized access to starter controls on oil pumps are <br /> prevented,how out-of-service and loading/unloading connections are secured,the appropriateness of <br /> security li htin ;or provide equivalence as allowed by CFR 112.7 a 2) <br /> Failed to provide sufficient secondary containment capacity for tank car or tank truck loading and <br /> 34 CFR 112.7(h)(1) unloading area if drainage area is not designed to flow into a catchment basin designed to handle <br /> discharges <br /> 35 CFR 112.7(h)(2) Failed to provide methods to prevent vehicles from departing loading and unloading areas before complete <br /> disconnection of transfer lines or provide equivalence as allowed by CFR 112.7(a)(2) <br /> Failed to inspect lower-most drains and all outlets of vehicles for discharge prior to filling and departure <br /> 36 CFR 112.7(h)(3) and take appropriate measures to prevent liquid discharge while in transit or provide equivalence as <br /> allowed b CFR 112.7(a)(2) <br /> Failed to evaluate field-constructed container for risk of discharge or failure due to brittle facture or other <br /> 37 CFR 112.7(i) catastrophe after repair,alteration, reconstruction,or change in service,or provide equivalence as allowed <br /> by CFR 112.7a 2 <br /> SPCC Plan failed to include a complete discussion of conformance to discharge prevention and <br /> 38 CFR 112.70) containment procedures as listed in part 112 and any applicable more stringent State rules,regulations, <br /> and guidelines <br /> If a response plan was not submitted to the RA,and secondary containment is not provided for qualified <br /> 39 CFR 112.7(k)(2) oil-filled equipment,the SPCC Plan failed to:(i)establish and document procedures for inspection or a <br /> monitoring program to detect equipment failure and/or discharge;(ii)provide oil spill contingency plan <br /> and/or written commitment of manpower,equipment,materials to control and remove oil discharge <br /> 40 CFR 112.8(b)(1) Failed to prevent discharge into the drainage system from diked storage areas and/or inspect <br /> accumulation priorto drainage,or provide equivalence as allowed by CFR 112-7(a)(2) <br /> 41 CFR 112.8(b)(2) Failed to use manual,open-and-closed design valves for the drainage of diked areas,or provide <br /> e uivalence as allowed by CFR 112.7(a)(2) <br /> Failed to design facility drainage system from undiked areas to flow into appropriate ponds,lagoons,or <br /> 42 CFR 112.8(b)(3) catchment basins(in areas not subject to flooding)designed to retain oil or return it to the facility,or <br /> provide equivalence as allowed by CFR 11 2.7(a)(2) <br /> Failed to equip the final discharge of all ditches with a diversion system that would retain oil in the facility in <br /> 43 CFR 112.8(b)(4) the event of an uncontrolled discharge if CFR112.8(b)(3)is not met,or provide equivalence as allowed by <br /> CFR 112.7(a)(2) <br /> 44 CFR 112.8(b)(5) Failed to provide two"lift"pumps,one permanently installed,where drainage waters are continuously <br /> treated in more than one treatment unit,or provide equivalence as allowed by CFR 112-7(a)(2) <br /> 45 CFR 112.8(c)(1) Container not compatible with oil stored and/or storage conditions,or failed to provide equivalence as <br /> allowed by CFR 112.7(a)(2) <br /> Failed to provide sufficient secondary containment capacity for a bulk storage tank that would hold the <br /> 46 CFR 112.8(c)(2) volume of the largest container plus sufficient freeboard to contain precipitation and/or diked area is not <br /> sufficiently impervious to contain discharged oil <br /> Allowed drainage of uncontaminated rainwater from a diked area and failed to:(i)keep bypass valves <br /> 47 CFR 112.8(c)(3) sealed closed;(ii)inspect retained rainwater prior to discharge,(iii)open bypass valve and reseal it under <br /> responsible supervision;(iv)maintain adequate records of such events;or provide equivalence as allowed <br /> by CFR 11 2.7 a i2 <br /> Inspe Phone: ece By: Title: <br /> N (209) 468-3453 <br /> EHD 28-02 Rev 2/19/10 Page 2 APSA INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.