My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R E C V <br />LE <br />rasa <br />Jk"11 17 200 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />IMPORTANT - READ THIS FIRST <br />NOV Fiber Glass Systems <br />Installation Statement <br />1. It is the End Users/Contractors/Customers responsibil- <br />ity to read and understand all engineering and installa- <br />tion related manuals and guides for the product to be <br />installed. <br />2. Fiber Glass Systems, L.P. (FGS) does not warranty the <br />installation of the goods nor shall it be responsible for <br />the performance or workmanship of any person or entity <br />engaged in the installation or installation supervision. <br />3. It is strongly recommended the installer be properly <br />trained. Fiber Glass Systems offers several types of cer- <br />tification training classes and/or installation job startups. <br />4. Fiber Glass Systems recommends a pre -installation <br />start up meeting with the Distributor and/or Regional <br />Manager and/or Field Service Representative to discuss <br />specifics of the installation to include but no limited to: <br />a. Review handling and storage <br />b. Review installation procedures <br />c. Tools and materials required for a proper installation <br />d. Job start up and/or certification training by a <br />certified FGS Field Service Representative <br />5. Fiber Glass Systems strongly recommends early hydro <br />testing to ensure the reliability of the field workmanship. <br />Testing is recommended at the following points of the <br />installation: <br />a. High pressure line pipe - 5000' maximum <br />b. Low pressure long straight runs of pipe - 2500' <br />maximum <br />c. Fitting intensive piping projects - 50 joints maximum <br />6. It is the End Users/Contractors/Customers responsibility <br />to read and understand the Field Service Policy as it <br />relates to on-site training and/or certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.