My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S�k T <br />J � � "t.:J IL � �J' •1.f ��7 <br />W <br />ENVIRONMENTAL WEALTH <br />©EPAi ITi EENT <br />Caution: The uninsulated flap is <br />extremely hot when the collar is on. <br />DO NOT TOUCH with bare hands. <br />Tighten the straps until the heating <br />collar is snug against the joint. <br />For 3" and 4" (75 and 100 mm) <br />flange joints, use a heating collar <br />that is one pipe size smaller. Re- <br />move the straps from the heating collar. <br />Carefully turn the collar inside out with <br />the heated area facing the I.D. of the <br />pipe. Place the heating collar in the I.D. <br />of the flange. <br />Piping System/ Pipe Cure Time/Minutes <br />Adhesive Size <br />Grade Pipe Fitting Flange <br />in mm <br />��� M � =M® <br />0. M <br />Allow the joint to return to ambient temperature before apply <br />ing stress to the joint. <br />Note: Fiber Glass Systems' electric <br />heating collars are designed to fit <br />around fittings and will overlap on pipe <br />joints and couplings. Exceeding the `tip <br />recommended cure time on pipe joints <br />where the heating collar overlaps may <br />shorten the life of the heating collar <br />and/or damage the pipe. <br />Refer to Chem Cure Paks Literature included with each kit for <br />complete instructions. Observe all safety precautions listed <br />on the installation sheet. <br />The adhesive bead will cure faster than the adhesive in the <br />joint. It is important that the joint not be pressurized until it has <br />been subjected to the proper time -temperature cycle. <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.