My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JL: Y 14 :,,11 <br />ENVIRONMENTAL HEALTH <br />DEPARTIM7-N7 <br />Air Test Procedures and Safety Precautions <br />TESTING WITH AIR OR GAS IS EXTREMELY DANGEROUS. <br />IF YOU CONTEMPLATE USING AIR OR GAS IN SPITE OF <br />THE WARNING OR IF YOU WILL BE PRESSURIZING HIGHER <br />THAN 11/2 TIMES THE LOWEST RATED ELEMENT OF THE <br />SYSTEM, REVIEW ALL SAFETY PRECAUTIONS BEFORE <br />STARTING THE TEST. <br />If testing with air or gas is required or requested to be per- <br />formed, the following testing procedures and precautions <br />must be followed. EXERCISE DUE CARE IN INSTALLING AND <br />TESTING THE PIPING SYSTEM. <br />• Visually inspect all bonded joints for proper insertion and <br />adhesive cure prior to pressurizing the piping system. A <br />gap between the adhesive bead and the fitting shoulder <br />indicates the possibility that joint pull-out exists. Make <br />any necessary repairs before pressurizing the piping sys- <br />tem. <br />• Check the integrity of the joints by pressurizing the sys- <br />tem to 25 psig (0.172 MPa) and holding the pressure for <br />a minimum of one minute. Soap all joints to test for leaks. <br />• If there are no leaks, raise the line pressure in the sys- <br />tem to a maximum of 50 psig (0.345 MPa). Again, hold <br />the pressure for a least one minute and soap all joints to <br />check for leaks. <br />• As serious personal injury or death can result, the pipe <br />inspector should take precautions for his/her personal <br />safety and protection against flying debris and also <br />against the whipping action of the pipe that can result <br />from the sudden release of stored energy. Adequate per- <br />sonal protective equipment should be used. <br />• Avoid direct contact with the piping system while it is <br />pressurized during testing until the actual checking of the <br />joints for leaks. Absolutely no one should be in the trench <br />while the pressure in the pipe is being increased. Notify <br />all site personnel before beginning the testing procedure. <br />• Do not straddle the pipe during testing or while checking <br />the piping system for possible leaks. Stand to the side <br />of the pipe. <br />• While the pipe is being checked for leaks, do not stand at <br />the end of the piping system or where it changes direc- <br />tions. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.