My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J,L.I4 Y 7 ,�,I <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />Make-up Dimensions (Wet) <br />Pipe <br />Size <br />Make-up Dimensions <br />in <br />Imm Iin <br />Imm <br />NEEM <br />After the final nipple length is determined, cut the other end of <br />the nipple and taper it, making sure the nipple is on the taper- <br />ing tool in exactly the same position as the first taper that was <br />used to measure the insertion length. <br />If solvent is used to clean bonding surfaces, allow the <br />cleaner to evaporate. Apply adhesive to all bonding sur- <br />faces and insert the nipple into the line by lifting the line <br />or moving it to one side. Pushing the pipe back into the <br />line will push the nipple into the bell. Make certain all ta- <br />pers are tightly locked. <br />Replace the protective mesh covering if the repair is <br />made on 2" (50 mm)pipe. <br />Leaking Joints <br />Any adhesive -bonded joint that leaks during pressure testing <br />MUST BE REMOVED AND REPLACED. Follow the previous <br />Extensive Damage procedures using two sleeve couplings <br />and pipe nipple or fittings, as required. <br />After completing any necessary repairs to the piping system, <br />follow the proper testing sequence to verify the system's in- <br />tegrity. <br />For Dualoy 3000/1- <br />Repair <br />000/LRepair couplings are produced in 2 -6 inch (50-150 mm) sizes. <br />These couplings are Listed by Underwriters Laboratories, Inc. <br />for use in buried fuel systems and can be installed without in - <br />trench tapering. <br />Minor damage (delaminated areas under 1 inch (25 mm) in di- <br />ameter) is typically caused by impact and appears in the form <br />of light discoloration or small circumferential cracks. Minor <br />repairs can be made using haft -couplings or full couplings. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.