My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FleXble <br />Connector <br />Jfi1LUli <br />ENVIRONMENTAL HEALTH <br />Cr�^.RrMENT <br />*Highest point in system minus the lowest point in system. <br />These test procedures are designed specifically for the NOV <br />Fiber Glass Systems' piping systems. The company is not <br />responsible for any damage to other products in the systems <br />such as rubber boots, hoses, etc. Please contact the manu- <br />facturer of other products for their recommended maximum <br />test pressure and time. <br />REPAIR PROCEDURES <br />Leaks can occur if secondary containment joints are not <br />properly bonded. Upon completion of required repairs and <br />before putting the line back into service, always pressure test <br />the repair work according to the procedures to assure the in- <br />tegrity of the system. For damaged pipe and for leaking joints, <br />the recommended repair methods are listed below. <br />Replacing Leaking Two -Piece Secondary Containment Fit- <br />tings - Do not use this procedure for containment crossovers. <br />Pipe to Fitting <br />I t <br />Fitting Flange <br />to <br />Fitting Flange <br />Z41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.