Laserfiche WebLink
FleXble <br />Connector <br />Jf­i1LUli <br />ENVIRONMENTAL HEALTH <br />Cr�^.RrMENT <br />*Highest point in system minus the lowest point in system. <br />These test procedures are designed specifically for the NOV <br />Fiber Glass Systems' piping systems. The company is not <br />responsible for any damage to other products in the systems <br />such as rubber boots, hoses, etc. Please contact the manu- <br />facturer of other products for their recommended maximum <br />test pressure and time. <br />REPAIR PROCEDURES <br />Leaks can occur if secondary containment joints are not <br />properly bonded. Upon completion of required repairs and <br />before putting the line back into service, always pressure test <br />the repair work according to the procedures to assure the in- <br />tegrity of the system. For damaged pipe and for leaking joints, <br />the recommended repair methods are listed below. <br />Replacing Leaking Two -Piece Secondary Containment Fit- <br />tings - Do not use this procedure for containment crossovers. <br />Pipe to Fitting <br />I t <br />Fitting Flange <br />to <br />Fitting Flange <br />Z41 <br />