Laserfiche WebLink
RECEIVED <br />SWRCB, January 2002 Page of <br />Secondary Containment Testing Report Form DEC 2 9 2016 <br />This form is intended for use by contractors performing periodic testing of UST secondary conta�rt�y �e, EALTH <br />appropriate pages of this form to report results for all components tested. The completed form, ��ll ttt�� !m <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the 60*0t*_Fncy. <br />1. FACILITY INFORMATION <br />Facility Name: Love's Fuel Center (Cover Page I) Date of Testing: 12/12&13, 2016 <br />Facility Address: 1553 Colony Rd., Ripon, Ca. 95366 <br />Facility Contact: Jessie Diaz Phone: (405) 687-1060 <br />Date ocal Agency Was Notified of Testing: 11/23/2016, by Afford -A -Test <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-1120/ICC #5246802 -LIT <br />Manufacturer Training <br />Manufacturer Component(s) Date Training Expires <br />Caldwell Systems Piping Sum s/UDC's/Fill Riser Sums July 30, 2017 <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #1 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #9 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #2 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #10 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #3 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #11 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #4&5 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #12 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #1 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #13 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #14 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #15 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #4 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #5 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #6 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #7 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #4 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #8 <br />X <br />❑ <br />❑ <br />❑ <br />I Piping Sump #5 <br />X <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied by Site and Disposed of in On Site Separator Tank. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:�Date: December 12&13.2016 <br />