Laserfiche WebLink
SWRCB, January 2002 <br />16. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard )EUARONMWAL HE <br />❑ Other (Spec) DEPARTMENT <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />Sump # 5 Sump # 6 <br />Sump # 7 Sump # 8 <br />Sump Diameter: 42" 42" <br />42" 42" <br />Sump Depth: <br />75" <br />74''/2" <br />74 %" <br />74" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />No Piping <br />No Piping <br />No Piping <br />No Piping <br />Highest Piping Penetration: <br />Penetrations <br />Penetrations <br />Penetrations <br />Penetrations <br />Height from Tank Top to Lowest <br />42" <br />42" <br />42" <br />30" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 44" <br />Water Line 44" <br />Water Line 44" <br />Water Line 44" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />No <br />No <br />No <br />No <br />product and water)?' <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />No <br />No <br />No <br />No <br />shutdown?* <br />Was fail-safe verified to be <br />N/A <br />N/A <br />N/A <br />N/A <br />operational?* <br />Wait time between applying water <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />and starting test: <br />Test Start Time: <br />11:30 <br />11:35 <br />11:40 <br />11:45 <br />Initial Reading (RI): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />12:00 <br />12:05 <br />12:10 <br />12:15 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced and <br />Yes <br />Yes <br />Yes <br />Yes <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Piping Sump #5 is for Annular Riser and Tank Probe Riser for Tank #1 Diesel. <br />Piping Sump #6 is for Annular Riser and Tank Probe Riser for Tank #2 Diesel. <br />Piping Sump #7 is for Annular Riser and Tank Probe Riser for Tank #3 Regular. <br />Piping Sump #8 is for Annular Riser and Tank Probe Riser for Tank #4 Regular. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to � of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />LTH <br />