Laserfiche WebLink
Monitoring System Certification <br />Monitoring System Certification UST Monitoring Site Plan <br />Site Address: LOVES 1553 COLONY ROAD RIPON CA 95366 <br />27S. <br />27. <br />AUU 2 VLO 16 . . . F-1. 226. F=FILLULAR <br />255. V=VAPOR <br />ry fNrAo �k 25. P=PROBE <br />I . T=TURBINE <br />. . . . . 245. . . . X=SENSOR <br />x <br />. . . . . . . . . . . . . . . 24. . . . . . <br />. . . . . . .. . . . . 23S. . . . . <br />. . . . . . . . . . . . . 23. . . . . . . . . . . <br />. . . . . . . 22S. . <br />. . . . . . . . . . . . =21S . . . . . . . . . . . . . . . <br />. . . . . . . . 21. . . . . . . . <br />ODIE <br />DIE <br />X O <br />87G <br />X O <br />V <br />F <br />x <br />P <br />X <br />O <br />X <br />O <br />XO <br />S' V <br />F <br />oXF <br />T <br />X <br />T X <br />T <br />X <br />90 F <br />O <br />X <br />p <br />X <br />7' <br />Date map was drawn: 8/11/11 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />