Laserfiche WebLink
UNDERGROUND STORAGE TANK SYSTEM <br />AFFIRMATIVE STATEMENT OF COMPATIBILITY <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />AuthorityCited: Title 23 California Code of Regulations §2h31(j) <br />Unified Program Agency Use Only <br />This document must be completed and submitted to your local UST Program Unified Program Agency prior to storing Biodiesel or E85 in an <br />underground storage tank (UST) system. If you store alternative fuel in more than one UST, you must submit a separate form for each tank. For <br />additional information, refer to the Unidocs Underground Storage Tank System Compatibility With Alternative Fuels available at www.unidoes.org. <br />I. Facility and Tank Information <br />Facility Name: Love's Travel Stop # 223 <br />Site Address: 1553 Colony Road <br />city: Ripon <br />Phone No.: (405) 687-1060 ext. <br />Tank ID #: T A b5) S S L-1 ` -T '5 Capacity (gal.): a� I C) <br />Bldg. No.: <br />Contact Name: Jesse Diaz <br />email: Jesse.Diaz@loves.com <br />ProductStored: <br />❑X B20; ❑ B100; ❑ E85; ❑Other (specify) <br />tk � Q" <br />II. Tank System Compatibility Y3 <br />The California State Water Resources Control Board (SWRCB) maintains a list of UST system components whose manufacturers have demonstrated <br />compatibility with alternative fuels. The list is available at www.waterboards.ca.gov/water_issues/programs/ust/alt eomp_opt/soc.shtml. In the <br />table below, provide the requested information for each component. If you unable to check one of the three boxes in the last column for any <br />component, you must apply for a permit from the local UST Program Unified Program Agency and retrofit the tank system with approved <br />components or cease the storage of alternative fuel in the UST system. <br />Manufacturer <br />Name <br />Model or Part <br />Number <br />Year <br />Manufactured <br />Compatibility With the Specific Product <br />Stored Has Been Demonstrated By <br />ElThird-partyapproval (e.g., UL listing) for use with <br />Double Wall Tank <br />this specific fuel. <br />Modern Welding <br />Glasssteel <br />2000 <br />Manufacturer's AffrnnativeStatement ofCompati- <br />g <br />bility posted on SWRCB website. <br />❑ Manufacturer's Affirmative Statement of Compati- <br />bilitv submitted with this form <br />ElThird-partyapproval (e.g., UL listing) for use with <br />Prima Product Pipe <br />Primary p <br />this specific fuel. <br />AO Smith /NOV Fiber Glass Systems <br />Red Thread <br />2000 <br />rmative <br />❑ bility (posted on SWRCB w bsitement ofCompati- <br />❑ Manufacturer's Affirmative Statement of Compati- <br />bili submitted with this form. <br />UN -100 www.unidoes.org 114 - 11/16/15 <br />