My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br /> SAN 10AQUIN ; :. <br /> Underground Storage Tank Program Inspection Report 0EN <br /> Facility Name: Facglty Phone: <br /> LOVE'S COUNTRY STORES OF CALIF#223 (209) 599-0740 =Nv,a DQ: 8 <br /> Facility Address: CERS ID: <br /> 1553 COLONY RD, RIPON, CA 95366 10184317 <br /> Inspection Contact Title: Phone: <br /> Jesse Diaz Environmental (405)242-2455 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION-Operating Permit 2361 - UST FACILITY <br /> Consent For: Consent Given By: <br /> O Inspection Ox Photos 0 Samples Jesse Diaz, Environmental <br /> Service Technician Onsite: Exp.Date: Designated Operator. Exp.Date <br /> Felix Ramirez 11/22/2018 Mark Rasmussen 12/27/2019 <br /> Service Technician Manufacturer's Training: <br /> VR, 07/07/20,VMI, 11/06/18, TT, 05/31/20 <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during Inspection <br /> File Review <br /> 101 HSC 25284 Failure to obtain a valid permit to operate from the EHD including but not limited to unpaid fees ❑V ❑R ❑COS <br /> 102 HSC 25264(a)(3)(A)/(B) No written agreement between tank owner and tank operator to monitor the tank system ❑V o R ❑COS <br /> 103 HSC 25292.2,25299.30 Current financial responsibility documents not submitted o V ❑R ❑COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current o V ❑R ❑COS <br /> 105 CCR 2632(d)(1), Failed to have an approved UST monitoring plan ❑V o R ❑COS <br /> 2534(d) <br /> 106 CCR 2632(d)(2), Failed to have an approved UST response plan ❑V c R ❑COS <br /> 2634(e) <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed o V ❑R ❑COS <br /> 108 CCR 2637(f),2638(e) Failed to notify the EHD 48 hours prior to conducting testing ❑V c R ❑COS <br /> 109 CCR 2637 Failed to test secondary containment ❑V o R e COS <br /> 110 CCR 2637(e) Failed to submit secondary containment test report within 30 days o V o R ❑COS <br /> 111 CCR 2638(a) Failed to test monitoring and leak detection equipment annually ■V ❑R c COS <br /> 112 HSC 25284.2 Failed to test spill containers annually ❑V c R ❑COS <br /> 113 CGR 2638(d) Failed to submit monitoring system certification test report within 30 days o V ❑R ❑COS <br /> 114 CCR 2636(f) Failed to perform 0.1 gph annual line lest for pressurized piping without fail safe or shut down c V n R n COS <br /> 115 CCR 2715(a) Failed to submit to EHD notification of designated operator identification or change Win 30 days ❑V ❑R o COS <br /> 116 CCR 2715 Designated operator,service tech or installer did not possess current ICC certification ❑V c R ❑COS <br /> 117 CCR 2663(h) Failed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years after o V ❑R e COS <br /> 118 CCR 2663 Failed to submit tank lining certification within 30 days or to conduct proper tests ❑V ❑R ❑COS <br /> 119 HSC 25299(a)(8), Documents were falsified or misrepresented ❑V o R ❑COS <br /> 25299 b 7) <br /> 120 CCR 2635(d) Failed to submit UST Certification of Installation/Modification c V o R e COS <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report ❑V ❑R n COS <br /> 122 CCR 2631Q) Failure to submit and maintain UST system component statement of compatibdity for substance stored c V ❑R ❑COS <br /> On Site Records <br /> 201 CCR 2712(b) Failure to maintain monitoring,maintenance,and follow up action records ❑V ❑R c COS <br /> FA0012659 PR0516526 SC001 08M9/2018 <br /> EHD 2301 Rev.10/31/2017 Page 1 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.