Laserfiche WebLink
Ver. 1 -L-pdf-3-18-1 0 <br />Tier I Quallfied,Facility SPCC Plan <br />This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a <br />facility that meets the applicability criteria in §112.3(g)(1). This template addresses the requirements of 40 CFR part 112. <br />Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a <br />facility attended fewer than four hours per day, at the nearest field office. When making operational changes at a facility <br />that are necessary to comply with the rule requirements, the owner/operator should follow state an. t t'' Vvpaity�rr})D <br />(such as for permitting, design and construction) and obtain professional assistance, as appropriat <br />Facility Description APR 15 2011 <br />Facility Name TRUCK LUBRICATION CO., INC. <br />Facility Address 523 W. LARCH RD., SUITE A EhMRnNMFNTAI HEALTH <br />City TRACY State CA I`ARMWWV10E8 <br />County SAN JOAQUIN Tel. Number ( 209) 833 - 3409 <br />Owner or Operator Name LONNIE GORMAN <br />Owner or Operator Address 523 W. LARCH RD., SUITE A <br />City TRACY State CA ZIP 95304 <br />County SAN JOAQUIN Tel. Number ( 209) 495 - 8109 <br />I. Self -Certification Statement (§112.6(a)(1)) <br />The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br />with the SPCC requirements: <br />I LONNIE GORMAN certify that the following is accurate: <br />1. 1 am familiar with the applicable requirements of 40 CFR part 112; <br />2. 1 have visited and examined the facility; <br />3. This Plan was prepared in accordance with accepted and sound industry practices and standards; <br />4. Procedures for required inspections and testing have been established in accordance with industry inspection <br />and testing standards or recommended practices; <br />5. 1 will fully implement the Plan; <br />6. This facility meets the following qualification criteria (under §112.3(g)(1)): <br />a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br />b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no <br />two discharges as described in §112.1(b) each exceeding 42 U.S. gallons within any twelve month period <br />in the three years prior to the SPCC Plan self -certification date, or since becoming subject to 40 CFR part <br />112 if the facility has been in operation for less than three years (not including oil discharges as described <br />in §112.1(b) that are the result of natural disasters, acts of war, or terrorism); and <br />c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 <br />U.S. gallons. <br />7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(a)(2) (environmental <br />equivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to <br />§112.9(c)(6) for produced water containers and any associated piping; <br />8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and I <br />have committed the necessary resources to fully implement this Plan. <br />Facility Name: TRUCK LUBRICATION CO., INC. Page 1 Tier I Qualified Facility SPCC Plan <br />