Laserfiche WebLink
09/10/2015 11:56 5308248776 LOVES $ r-AtiVEL PAGE 12/12 <br /> . - s <br /> SEP 10 2015 <br /> S'WRCB,January 2002 Page of <br /> 9. sri�OVE�CON APMP T"YONMENTAL <br /> Facility i �Fot With,S iWOverfM Contaaximent Boxes D <br /> SPHI/Overfill Contaiaazaent Boxes are Present,but were Not Tested X *See comments below <br /> Test Method Developed By: ❑Spill BucImt Manufacturer ❑Industry Standard ❑ProfessiouW Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑'Vacuum ❑Hydrostatic <br /> ❑Other(S,pecify) <br /> Test Equipment Used: Equipment Resolution- <br /> Spin Boa# Spill Box.# Spfil Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> sw&g test: <br /> Test Start Time: <br /> Initial Reading(RD: <br /> Test,Bud Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading Wq R�. <br /> Pase/Y"Threshold or <br /> Criteria: <br /> COMMentS—(include information on repairs made prior to testing, and recommendedfollow upforfaited tesrs1 <br /> +Spili/Overfill Bows tested whit annasl Mouiitorine System Certification. <br />