My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/10/2015 11:56 5308248776 LOVES $ r-AtiVEL PAGE 12/12 <br /> . - s <br /> SEP 10 2015 <br /> S'WRCB,January 2002 Page of <br /> 9. sri�OVE�CON APMP T"YONMENTAL <br /> Facility i �Fot With,S iWOverfM Contaaximent Boxes D <br /> SPHI/Overfill Contaiaazaent Boxes are Present,but were Not Tested X *See comments below <br /> Test Method Developed By: ❑Spill BucImt Manufacturer ❑Industry Standard ❑ProfessiouW Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑'Vacuum ❑Hydrostatic <br /> ❑Other(S,pecify) <br /> Test Equipment Used: Equipment Resolution- <br /> Spin Boa# Spill Box.# Spfil Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> sw&g test: <br /> Test Start Time: <br /> Initial Reading(RD: <br /> Test,Bud Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading Wq R�. <br /> Pase/Y"Threshold or <br /> Criteria: <br /> COMMentS—(include information on repairs made prior to testing, and recommendedfollow upforfaited tesrs1 <br /> +Spili/Overfill Bows tested whit annasl Mouiitorine System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.