Laserfiche WebLink
JUL 2 8 2014 <br />SWRCB, January 2002 ENVIRONM bTAL"EALTH <br />C, crrrnvPARVPTPFTFWWG DEPARTMENT <br />Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spew) <br />Test Method Used: ❑ Pressure 0 Vacuum X Hydrostatic <br />Q Other (Sped) <br />Test Equipment Used: Pressure Gauge Equipment Resolution; <br />Piping Run WAIN piping Run H SAT Piping Run # D SAT Piping Run # D SAT <br />DSL <br />Pip ing Material: <br />FIBREGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />3" <br />3" <br />T' <br />Length of Piping Run: <br />140' <br />18, <br />18' <br />Product Stored: <br />DSI, <br />DSL <br />DSL <br />DSL <br />Method and location of <br />piping -run isolation: <br />UNDERGROUND <br />UNDERGROUND <br />_ <br />UNDERGROUND <br />---- <br />UNDERGROUND <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MIN <br />I SMIN <br />15MIN <br />15MIN <br />- <br />Test Start Time: <br />_ <br />12 PM <br />12PM <br />12PM <br />12PM <br />Initial Reading (Rt): <br />51/4 <br />5 <br />51/3 <br />5 <br />Test End Time: <br />1 PM <br />1 PM <br />1 PM <br />I P <br />Final Reading (RF): <br />51/4 — <br />5 <br />5113 <br />5 <br />Test Duration; <br />t hr <br />1 hr <br />1. hr <br />1 hr <br />Change in Reading (RF -R): <br />0 <br />0 <br />0 <br />0 <br />Pass/FaiI Threshold or <br />Criteria: <br />2P5t <br />.2PSI <br />.2PSI <br />.21,8I <br />Test Result: <br />X Pass D Fail <br />X Pass ❑Fait <br />X Pass ❑Fail <br />X Pass OFa11 <br />Comments — (inchrde infornratiun on repairs urade prior to feslirrg, and recon»nended follow-ap or ailed tesls) <br />