Laserfiche WebLink
O.P0.0 (N• •.0 <br />SAN JOAQUIN COUNTY <br />c. ENVIRONMENTAL HEALTH DEPARTMENT <br />-. 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />cq�/koR�'�P <br />&(5rvlk cwt <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />CW <br />Inspection Date: <br />lc� <br />Facility Address: <br />PA'\ P��, N <br />Service Request #: <br />'!8 vX-. 00 69Q D(�� <br />Onsite Service Technician's Na <br />e 0, m <br />I C Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />- I b - <br />iI&a-vu, <br />❑ line test programmed <br />❑ <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />• ' <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />,, <br />pl.Wga— <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: _ <br />M� <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />`4[J <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />• ' <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />W <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />,, <br />pl.Wga— <br />minutes <br />S condary containment testing for: <br />LIII Piping <br />M� <br />Sump(s) UST(s) <br />s <br />Tting for the above components are next due by: <br />i. <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />Thisffljacifi is NOT APPROVIED tq operate <br />M <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 <br />>I <br />�� tt <br />• ' <br />f <br />! W Or <br />C <br />W <br />a <br />• <br />,, <br />pl.Wga— <br />iNo <br />��M' �UMAI <br />M� <br />M <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 <br />