Laserfiche WebLink
oPqu IN••.0 <br />�.• ,�� .o <br />SAN .lOAOUIN COUNTY <br />Q. �+ ENVIRONMENTAL HEALTH DEPARTMENT <br />N. 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.org/ehd <br />FORa\P <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUES NSPECTION R PORT <br />:C�� �k, <br />Facility Name: <br />Insp'b0ion Date: <br />V 2 �3 <br />' 02 I — 2 <br />Facility Address: <br />Service Request #: <br />3 oh G <br />+lll <br />it -NI ,� <br />Onsite Service Te1cAhn►ician' N me: <br />ICC S/ rvice Technician/Installer Exp. Date: <br />Manufacturer Training: 2 L��,�— <br />4l, vV� <br />4-(O I <br />UR- .�- -)—IG <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />• <br />❑ electronic Serial #: <br />+lll <br />it -NI ,� <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: _ <br />El <br />❑ line test programmed <br />►� i ,• • , <br />sensor <br />may( <br />positive shutdown Model: '?,Q g <br />gfail safe Serial #: <br />s UST(s) <br />PO <br />4 PinA <br />sensor I f <br />❑ positive shutdown Model: <br />❑ <br />❑ fail s fe Serial #: <br />❑ <br />NA WQ <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 950'0 <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />• <br />❑ Caldwell System ❑ Other <br />+lll <br />it -NI ,� <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary <br />Primary piping testing at: <br />El <br />����Sa. <br />►� i ,• • , <br />minutes <br />-J <br />�c,onda containment testi g for- <br />"� <br />`SUm <br />UDC(s) � P� Piping <br />s UST(s) <br />PO <br />Te ting for the above components are next due by: <br />Q <br />Note: Plea=_e be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />Rev 4/30/12 <br />0 A ION tax* oh"W <br />--=21mmmomt <br />ra •• i ►Ell I 9ffl_`�• vo� <br />• <br />1 ► <br />+lll <br />it -NI ,� <br />i <br />mff• , • 'moMIN, [P'. " : <br />' <br />����Sa. <br />►� i ,• • , <br />• s <br />Milli! anown" <br />Poll <br />MIA <br />• . <br />-•WA <br />VMO�VA'§M%-4,= <br />Rev 4/30/12 <br />