Laserfiche WebLink
AtUIEWEL Monitoring System Certification UST Monitoring Site Plan <br /> Site Addfessq 4 LOVES 1553 COLONY ROAD RIPON CA 95366 <br /> dIVVIRC�NMEI�TA .. 0 .27. .. <br /> IJCI��TIJ r1CU9�]r�llC(\rT 26S. A=ANNULAR . <br /> x <br /> . . . . . . 26. . . . . . F=FILL . . . . . . . . . . . . . . . . . . <br /> 25S. V=VAPOR P=PROBE <br /> 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 25. T=TURBINE <br /> . , . , . 24S. X=SENSOR <br /> 24. <br /> 23S. F <br /> x 23. DIE DIE 870 <br /> F <br /> . 225. X F X F X P x <br /> . . . . . . . . . . . .21S. . . . . . . . . . 87� <br /> 21. . . . . . . . . . . !. `'I <br /> xoF <br /> . . . . . . . . . . . . . . . XO a0 <br /> 9 <br /> . . . . . . . . . . . . . . 0 <br /> . . . . . . . . . . . . . . . O <br /> . . . . . . . . . . . . . . . T Elx <br /> X x <br /> X P <br /> . . . . . . . . . . . . . . . X <br /> . . . . . . . . . . . . . . T <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .14. 13. . . .10. 9. . . . .6. n 5. . . . . 2. <br /> 1. <br /> X . .� X . . . . . . . . . . <br /> E <br /> . . . . . . . . . <br /> . .12. 11. . . . . . . . 16 15. 8.. 7. . . . .4. . .3. . . . . . . . <br /> . . . <br /> 3. . . . . . . . <br /> . . . . . . . . . . . . . . . . . .�. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> �. <br /> . . . . . . . . . . . . . . . . . 20R .19. . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: 8/11111 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />