Laserfiche WebLink
SWRCB,January 2002 JrNtlg©jL_?Pf,�— <br /> 6. SECONDARY PIPE T1 STINGL 44QQA In OP. <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ProfeWothttlIVTA <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1-Main Piping Run#21-5 Piping Run#22-S Piping Run#23-5 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 4" 3" 3" <br /> Length of Piping Run: Approx. 140' Approx. 18' Approx. 18' Approx. 18' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot at STP Test boot at Test boot at Test boot at <br /> piping-run isolation: Piping Sump#1 & UDC#21-M UDC#22-M UDC#23-M <br /> UDC#21-M <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:40 9:45 10:30 9:50 <br /> Initial Reading(Rj): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:40 10:45 11:30 10:50 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *M=Master <br /> *S=Satellite <br />