My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 11:15:30 AM
Creation date
10/19/2018 3:11:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2014 - 2015
FileName_PostFix
2014 - 2015
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AEGENEE <br /> SWRCB,January 2002 JAfie"_K- l_ <br /> 9. UNDER-DISPENSER CONTAINMENT (UDC)TESTING r-NVIRONM <br /> Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engine t'T" <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum X Hydrostatic <br /> F1 Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: 002 <br /> UDC#21-M UDC#21-S&22-M UDC#22-S&23-M UDC#23-S&24-�ti1 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 12" 12" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to No Electrical No Electrical No Electrical No Electrical <br /> Lowest Electrical Penetration: Penetrations Penetrations Penetrations Penetrations <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Level 28" Water Level 28" Water Level 28" Water Level 28" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No No No <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- No No No No <br /> safe shutdown?* <br /> Was fail-safe verified to be N/A N/A N/A N/A <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 10:50 10:55 11:00 11:05 <br /> Initial Reading(111): .001 .001 .001 .001 <br /> Test End Time: 11:20 11:25 11:30 11:35 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testin ? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.