Laserfiche WebLink
� EG IVLE) <br /> SWRCB,January 2002 Page of <br /> 11. FILL RISER CONTAINMENT SUMP TESTING �QN <br /> Facility is Not Equipped With Fill Riser Containment Sumps v <br /> Fill Riser Containment Sumps are Present,but were Not"tested X *See comments below - <br /> Test Method Developed By: !Sump Manufacturer Industry Standard Professional t:ngineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump#I Mill Sump#2 Fill Sump#3 Fill Sump#4-UR <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 75 %" 75 75" 74" <br /> Height from Tank Top to Top of 35" 32" No Piping 19" <br /> Highest Piping Penetration: Penetrations <br /> Height from Tank Top to Lowest 43" 43" 44" 33" <br /> Electrical Penetration: <br /> Condition of sump prior to *See comments *See comments *See comments *See comments <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? 11 <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Fill Riser Containment Sumps not tested with this testing event. <br />