Laserfiche WebLink
09110/2015 11: 56 5308248776 LCPJES PAGE 06/12 <br /> SWRCfl,January 2002 -up Ab IV E U <br /> Secondary Containment Testing Report Form SEP 10 2010 <br /> This form is intended for use by contractors performingperiodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this farm to report results for all components tested. The completed form, written test p"N" n�IVB ENTAL <br /> printouts from tests(if applicable),should be provided to the facility ownerloperator for submittal to the 100a1 r,490k"a'SM0PT+Ar:k17 <br /> 1. FACILITY INFORMATION <br /> Facility Name: Love's Fuel Center Date of Testing: August 26,2015 <br /> Facility Address: 1553 Colony Rd,Ripon,Ca.95366 <br /> Facility Contact Jessie Diaz Phone: (405)687-1060 <br /> Date Local Agency Was Notified of Testing: 8/14/2015,by Afford-A-Test <br /> Name of Local..Agency Inspector(if present during te.eting): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: R&D Co fiance Testing <br /> Technician Umductitig Test: Benjamin:F'.Duncan Jr. <br /> Credentials: ❑CSLB Licensed Contractor X SR'RCB Licensed Wank Teeter <br /> License Type. Tank Tester License Number;90-1120/ICC*5246802-UT <br /> Manufacturer Trainhna <br /> Manufacturer Co onen s) Date Training Expires <br /> Caldwell$ turns LTDC fuly,2017 <br /> 3. SUNEY AR'Y'OF TEST RESULTS <br /> Component Pass Rall Not Repairs No <br /> Component pass FaU t Repairs <br /> Tested Made Tested I Made <br /> Dispenser Sump#17&18 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑� ❑ Ll ❑ ❑ 11 El <br /> L ❑ ❑ ❑ 1 ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test fluid supplied and recovered for reuse by,lz&D Compliance Testing. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the faces stated in this document are accurate and in full compllame%*h legal requirements <br /> Technician's Signature: a Ery Zg Date: August 26,2015 <br />