My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
6767
>
2800 - Aboveground Petroleum Storage Program
>
PR0537644
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 4:51:15 PM
Creation date
10/19/2018 4:28:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537644
PE
2832
FACILITY_ID
FA0004024
FACILITY_NAME
STOCKTON EAST WATER DIST
STREET_NUMBER
6767
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10117035
CURRENT_STATUS
01
SITE_LOCATION
6767 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASE ASSOCIATES <br />January 10, 2006 <br />John Yoshimura <br />Stockton East Water District <br />P.O. Box 5157 <br />Stockton, CA 95205-0157 <br />Subject: Spill Prevention Control And Countermeasure (SPCC) Plan <br />Dear Mr. Yoshimura: <br />Enclosed is the Spill Prevention Control And Countermeasure (SPCC) Plan for the Stockton <br />East Water District (SEWD) as the subject facility. <br />This fulfills the documentation of the SPCC Plan requirements per the applicable State of <br />California and Federal laws and regulations. This documentation of the SPCC Plan is to be <br />kept at the SEWD office and be made available to the agencies that will request to see it (i.e., <br />the Local Administering Agency for the CalARP program, and the Regional Water Quality <br />Control Board). <br />The following steps need to be accomplished to properly complete the SPCC Plan <br />documentation: <br />1) Complete the "Management Approval" on Page x of the SPCC Plan documentation by <br />having that page of the SPCC Plan signed and dated as indicated on the page. <br />2) Provide one (1) copy of Page x when the page is completed with the required <br />information to be sent to BASE ASSOCIATES for our records. <br />The SPCC Plan requirements include activities so that: <br />a) Responsibilities stated in the SPCC Plan are fulfilled by the Stockton East Water <br />District (SEWD) staff. <br />b) Operational procedures related to the SPCC Plan are written. <br />c) Training on the SPCC Plan related activities is provided to the SEWD staff. <br />d) Designated inspections are performed when required and documented. <br />e) Designated testing is performed when required and documented. <br />f) Spill Contingency Plan is implemented and followed when needed. <br />I will await receipt of your completed "Management Approval" page x. <br />The training on the SPCC Plan related activities can be provided to the appropriate SEWD <br />personnel by BASE ASSOCIATES (e.g., as was done for the City of Windsor - Corporation <br />Yard staff). Please inform BASE ASSOCIATES if you would wish a proposal for the SPCC <br />training. <br />P. 0. Box 781 Phone: (916) 687-6586 <br />Elk Grove, CA 95759-0781 Fax (916) 687-8804 <br />E-mail: dinbas@ix.netcom.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.