Laserfiche WebLink
R E <br /> fiVEm <br /> Spill Prevention Coven fianceCOr oraVlon -JUL 14 2017 <br /> Periodic Integrity Test Certificate <br /> PA.Box 1299........Waterford,CA 95386 Telephone: (209)969-0$Sfi'''�R��IMENTAL HEALTH <br /> Email: s cco1 iott4ail.com DEPARTMENT <br /> Clicnt$rown Sand and Gravel Contact Person: Tixnoth Cl ent Shoff Mir <br /> Address 800Mossdale Road Telephone: 20{ 9)321-0046 <br /> City/State/ZipJLathrap.CA 95330 <br /> Location of Tanks if different from Client Address—Shop Area <br /> Tank Info (brand/product stored/gals/UL#)unbranded/approx 6000gals/diesel/No UL# <br /> Description of Secondary Contairunent Open metallic diked second containment <br /> Date of Test_4/20/2017 Test Supervisor(s)Mat Taut McWhorter <br /> jFTHOD OF PERIODIC I NTFGRITY TEST--Primary_2L Secondarg X <br /> 1. Steel Thickness'fest(in accordance with API-653 and/or STI P001 (5 edition)- <br /> readings(instrwnentation;f M-8810 ultrasonic microprocessor: <br /> minimum end/wall thickness( minimum bottom/wall thickness_ <br /> corrosion-circle one(significant or nominal.)...pitting-circle one(significmit or nominal) <br /> Coating required(explain) <br /> Detailed wall thickness readings are held in the SpC Corp client-file(total readings <br /> 2. Nitrogen Blanket—Y N(document psi readings) Duration <br /> 3. CO2 Blanket Y N(document psi readings) Duration <br /> 4. Tracer Gas_Y N(document inert gas used) Duration <br /> Tracer Gas compatibility factors(describe) <br /> 5. Pressure-Test Y (document psi readings) Duration <br /> 6. Vacuum Test Y N(document inches of Mercury readings Duration <br /> 7. Sonar-Test Y N(document db readings) Duration <br /> 8. Camera model Lorex MC81845/interstitial XYN(findi_ugsft fuel in annulus <br /> 9. Hydro-Carbon Sensor(probe) OMNTEC BOA-PDS XY N no fuel in annulus <br /> 10.Hydrology(Water Column)__Y N(document inches of water column <br /> readings) <br /> Duration <br /> TX:ST RESULTS <br /> I`-Stage: <br /> Dass X Fail—(quantify) camera confirms no fuel roduct in 2ndml containment <br /> 2°a-Stage: <br /> Pass A Fail (quantify) sensor confirms no fuel product in 2ndarY containment <br /> Comments section Housekec Lm recommendations made to client—clean AST <br /> Next Scheduled Periodic Integrity Test <br /> If primary/secondary containment passes test, schedule next periodic integrity test no <br /> later than 5 years Brom of initial test 4/20/2022 <br /> Date of Next Scheduled Test <br /> (Certificate) <br /> SPC Corp Representative <br /> 8,2:a6ed 221728917:01 :woad 82:2i LT02-bt--1nf <br />