Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax: (209)468-3433 Web:www.sigov.org/ehd <br /> CONTINUATION FORM Page: 4 of 7 <br /> OFFICIAL INSPECTION REPORT Date: 09/19/12 <br /> Facility Address: 12988 W. McDonald Rd., Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I, CLASS II,or MINOR-Notice to Comply) <br /> Notice to Comply - Minor violations: (201, 301, 303, 501, 502, 504, 505, 507, 510, 513, 517, 518, 519, <br /> 609, 611, 619) <br /> 201. The Professional Engineer (PE) certification is incomplete. The certification did not include <br /> statements about visiting the facility, industry standards, inspections and testing, or the adequacy of the <br /> Plan. The PE certification must include all of the aspects in 40 CFR Part 112.3(d)(1), including attesting <br /> that the PE is familiar with 40 CFR 112, he or his agent has visited and examined the facility, the Plan <br /> has been prepared in accordance with good engineering practice, including consideration of applicable <br /> industry standards, procedures have been established for required inspections and testing, and the Plan <br /> is adequate for the facility. Immediately obtain a complete PE certification for the facility's Spill <br /> Prevention Control and Countermeasure (SPCC) plan. Submit a copy of the completed, certified SPCC <br /> plan to the EHD by October 20, 2012. <br /> 301. After a leak in the pipes, the facility switched from periodic painting of the piping to PVC tape wrap <br /> for corrosion protection; the Plan was not amended to include this change. The SPCC Plan must be <br /> amended when there is a change in the facility design, construction, operation, or maintenance that <br /> materially affects its potential for a discharge, within 6 months of the change, and implemented as soon <br /> as possible, not later than 6 months following preparation of the amendment. Immediately make all <br /> necessary amendments to the SPCC Plan to accurately represent the procedures and policies currently <br /> in place at the facility. <br /> 303. The SPCC Plan was last reviewed on October 11, 2001. A review and evaluation of the plan must <br /> be conducted at least once every 5 years. You must document your completion of the review and <br /> evaluation, and must sign a statement as to whether you will amend the Plan, either at the beginning or <br /> end of the Plan, or in a log or appendix to the Plan. The following words will suffice: <br /> "I have completed the review and evaluation of the SPCC Plan for (name of facility) on (date), and <br /> will (will not) amend the Plan as a result." <br /> As a result of this review and evaluation, the SPCC Plan must be amended within 6 months of review, <br /> and recertified by a professional engineer if any technical amendments were made. Immediately <br /> conduct a review of the facility SPCC Plan and make any necessary amendments. <br /> 501. A cross-reference is not included in the SPCC Plan. If you do not follow the sequence specified in <br /> 40 CFR 112 for the Plan, you must prepare an equivalent Plan and supplement it with a section cross- <br /> referencing the location of requirements in 40 CFR 112 and the equivalent Plan. Immediately amend <br /> the Plan to include an accurate cross-reference or to follow the required sequence. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> Stacy Rivera (209) 468-3440 lea, <br /> P •�/Y�lt/�Q�%C <br /> EHD 23-02-003 Rev 04/19/12 CONTINUATION FORM <br />