My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARKET
>
22
>
2800 - Aboveground Petroleum Storage Program
>
PR0527617
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 3:43:51 PM
Creation date
10/19/2018 4:54:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527617
PE
2832
FACILITY_ID
FA0001506
FACILITY_NAME
STOCKTON POLICE DEPARTMENT
STREET_NUMBER
22
Direction
E
STREET_NAME
MARKET
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14904001
CURRENT_STATUS
01
SITE_LOCATION
22 E MARKET ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> STOCKTON POLICE DEPARTMENT 22 E MARKET ST, STOCKTON June 06 2016 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service o V n R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V n R n COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ■V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V o R o COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations V n R o COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation n V -R ❑COS <br /> 4020 See below Unlisted Training violation ❑V o R n COS <br /> 4030 See below Unlisted Operations/Maintenance violation n V o R n COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation -:V n R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section. <br /> The plan has no cross referencing section. The Spill Prevention, Control, and Countermeasure(SPCC)Plan does not <br /> follow the order or requirements in 40 CFR Part 112, and a cross-reference was not provided. If you do not follow the <br /> sequence specified in 40 CFR 112 for the Plan, you must prepare an equivalent Plan and supplement it with a section <br /> cross-referencing the location of requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC <br /> Plan to include a cross-reference or to follow the required sequence. <br /> This is a minor violation. <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan. <br /> Management approval lacks a signature and date by an authorized individual with the authority to commit necessary <br /> resources. The Spill Prevention, Control, and Countermeasure(SPCC) Plan must have the full approval of <br /> management at a level of authority to commit the necessary resources to fully implement the Plan. Immediately <br /> obtain required management approval for the SPCC Plan for this facility. <br /> This is a Class II violation. <br /> 604 CFR 112.7(a)(3)No facility diagram or didn't show location and contents of containers,transfer stations, and pipes. <br /> The plan did not include any facility diagram showing the 6,000 gallon unleaded gasoline aboveground storage tank <br /> (AST),the 5,200 gallon diesel generator above ground tank(AST). The plan did not have any diagram of piping or <br /> transfer stations. The Spill Prevention, Control,and Countermeasure(SPCC) Plan shall include a facility diagram <br /> which must mark the location and contents of each fixed storage container and the storage area where mobile or <br /> portable containers are located. It must identify the location of and mark as"exempt"underground tanks. It must <br /> also include all transfer stations and connecting pipes, including intra-facility gathering lines. Immediately update the <br /> facility diagram to include all of the required information. Submit a legible copy of the updated facility diagram to the <br /> EHD for review. <br /> This is a Class II violation. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.