Laserfiche WebLink
Geological Technics Inc. Page 4 <br /> Geologic Report for CFM Plant <br /> Project 394.3 <br /> November 28,1995 <br /> II <br /> The following information was provided to Geological Technics Inc. via telephone <br /> by Mr. Bob Bennett of Tri-Valley rowers:G3i <br /> October 27, 1995 , <br /> The fourth and fifth borings were advanced just to ;the north and south of where the <br /> large diameter borings merged. Confirmation soil samples were collected and <br /> handled by Tri-Valley Growers personnel. The two borings were backfilled the <br /> afternoon of October 27, 1995 using a control density fill as the others. <br /> iti <br /> Signatures and Certification <br /> I <br /> Geologic logging of field activities and supervision of soil sample collection was <br /> performed on October 24-26, 1995 was performed bY ig Geological Technics Inc. under <br /> supervision of Ray Kablanow, in accordance with accepted geologic and hydrologic <br /> standards of the State of California accepted aril in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> ii <br /> This report was prepared by: <br />{ �t <br /> i <br /> i'r <br /> M 1r <br /> Timothy J. McDonald <br /> Geologist <br /> �1 <br /> ------------- <br /> 5� <br /> i <br /> Raynold I. Kablanow Ii,Ph.D. <br /> California Registered Geologist#5234 <br /> Registered Environmental Assessor#901 <br /> �1 <br /> iY <br /> 'E <br /> �b <br /> i <br /> it <br /> � i� <br />